Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Keterkaitan kuantitas perkerjaan dengan durasi dan tenaga kerja pada proyek konstruksi bangunan bertingkat tinggi
Author
Wijaya, Phillip
Additional Author(s)
Leman, Susanto
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Program Studi Teknik Sipil UK Petra, 2015
Language
Indonesian
ISBN
-
Series
Skripsi No. 21012005/SIP/2015
Subject(s)
CONSTRUCTION INDUSTRY-LABOR PRODUCTIVITY
CONSTRUCTION PROJECTS-MANAGEMENT
CONSTRUCTION INDUSTRY-MANAGEMENT
Notes
Appendix: p. 167-308
. Bibliography: p. 165-166.
Abstract
-
Physical Dimension
Number of Page(s)
xxi, 308 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
02644/15
(T) SIP 2005
Library - 8th Floor
Unavailable : Removed
Similar Collection
by author or subject
Perbandingan aplikasi progam Microsoft Project dan Primavera dalam penjadwalan proyek konstruksi
Perencanaan site layout proyek konstruksi dengan menggunakan integrated cad-based model
Studi pemanfaatan internet dalam pelaksanaan manajemen konstruksi
CPM in construction management
Optimasi infrastruktur
Identifikasi faktor-faktor kritis pada proyek kerjasama operasi, studi kasus pada proyek jalan layang waru dan bandara juanda
Identifikasi dan evaluasi faktor-faktor kompetensi sosial manajer proyek
Analisa frekuensi dan penyebab change order pada proyek apartemen di Surabaya