Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Keterkaitan kuantitas perkerjaan dengan durasi dan tenaga kerja pada proyek konstruksi bangunan bertingkat tinggi
Author
Wijaya, Phillip
Additional Author(s)
Leman, Susanto
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Program Studi Teknik Sipil UK Petra, 2015
Language
Indonesian
ISBN
-
Series
Skripsi No. 21012005/SIP/2015
Subject(s)
CONSTRUCTION INDUSTRY-LABOR PRODUCTIVITY
CONSTRUCTION PROJECTS-MANAGEMENT
CONSTRUCTION INDUSTRY-MANAGEMENT
Notes
Appendix: p. 167-308
. Bibliography: p. 165-166.
Abstract
-
Physical Dimension
Number of Page(s)
xxi, 308 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
02644/15
(T) SIP 2005
Library - 8th Floor
Unavailable : Removed
Similar Collection
by author or subject
Produktivitas alat berat pada pekerjaan galian gedung P1-P2 UK Petra
Kajian metode takt time pada proyek konstruksi
Penerapan value engineering pada proyek konstruksi
Studi kasus pengukuran produktivitas pekerjaan pemancangan pada proyek x dan faktor-faktor yang mempengaruhinya
Pengaruh kinerja tim pelaksana proyek pemerintah bagi pihak kontraktor terkait cash in-flow dalam proyek konstruksi
Strategi perusahaan konstruksi di Surabaya di era krisis
Jenis pekerjaan yang mendominasi komposisi biaya pada proyek apartemen
Usulan sistem pengendalian biaya proyek (studi kasus kontraktor a, b dan c di Surabaya)