Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Produktivitas alat berat pada pekerjaan galian gedung P1-P2 UK Petra
Author
Sutanto, Kelvin Rudy
Additional Author(s)
Kosasi, Michael Halmar
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Program Studi Teknik Sipil UK Petra, 2014
Language
Indonesian
ISBN
-
Series
Skripsi No. 21012011/SIP/2014
Subject(s)
BUILDING-EQUIPMENT AND SUPPLIES
CONSTRUCTION INDUSTRY-MANAGEMENT
CONSTRUCTION EQUIPMENT
Notes
Appendix: p. 53 - 108
. Bibliography: p. 52.
Abstract
-
Physical Dimension
Number of Page(s)
xix, 108 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
00561/15
(T) SIP 2011
-
Unavailable : Removed
Similar Collection
by author or subject
Faktor-faktor manusia yang mempengaruhi penolakan SDM dalam menjalankan sistem informasi berbasis teknologi informasi (studi pada SDM perusahaan konstruksi di Surabaya)
Keterkaitan kuantitas perkerjaan dengan durasi dan tenaga kerja pada proyek konstruksi bangunan bertingkat tinggi
Penanganan sisa material ready-mixed concrete pada proyek konstruksi
Pengaruh dari faktor-faktor yang berperan dalam pemilihan project delivery system di Surabaya
Standarisasi jenis pekerjaan dalam rab untuk pekerjaan struktur bangunan tinggi di Indonesia
Studi kasus sistem informasi akuntansi pada perusahaan konstruksi PT. X
Faktor-faktor pengendali adaptasi bangunan pada kawasan sentra bisnis di Surabaya
Analisis penyebab dan solusi terhadap sisa material batu bata, besi tulangan dan kayu