Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Impacts of managerial and operational problems on facility layout arrangement in multi products precasting yards
Author
Benu, Maria Irene Beatry
Additional Author(s)
-
Publisher
Thailand: 2002
Language
English
ISBN
-
Series
Tugas Akhir Thesis No. ST-02-36
Subject(s)
CONSTRUCTION INDUSTRY-MANAGEMENT
Notes
-
Abstract
-
Physical Dimension
Number of Page(s)
vi, 107 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
01295/03
T2 690.068 Ben I
-
Available
2.
01294/03
T2 690.068 Ben I
-
Available
Similar Collection
by author or subject
Studi tentang penggunaan jasa asuransi pada proyek konstruksi di Surabaya
Model matematis hubungan kinerja konsultan dan komunikasi dalam proyek konstruksi
Studi kasus penerapan schedule assessment pada penjadwalan proyek salah satu gedung bertingkat di Surabaya
Analisa faktor-faktor positioning perusahaan kontraktor kelas B (besar) di Surabaya
Hubungan antara kuantitas pekerjaan dengan durasi pada pekerjanan proyek konstruksi bangunan bertingkat tinggi
Pengukuran produktivitas pekerjaan dinding hebel studi kasus pada proyek apartemen x
Hubungan antara time overruns dan kepuasan konsumen menurut pendapat kontraktor dan pengembang pada proyek perumahan
Risiko dan penanganannya pada proyek konstruksi: studi kasus pada proyek gedung dan infrastruktur