Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Studi kasus penerapan schedule assessment pada penjadwalan proyek salah satu gedung bertingkat di Surabaya
Author
Untung, Donny
Additional Author(s)
Jessica, Stephanie
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Program Studi Teknik Sipil UK Petra, 2017
Language
Indonesian
ISBN
-
Series
Skripsi No. 21012176/SIP/2017
Subject(s)
CONSTRUCTION INDUSTRY-CASE STUDIES
CONSTRUCTION INDUSTRY-MANAGEMENT
PROJECT MANAGEMENT
Notes
Appendix: p. 58-85
. Bibliography: p. 57.
Abstract
-
Physical Dimension
Number of Page(s)
xvi, 85 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
02799/17
(T) SIP 1217
Library - 8th Floor
Available
Similar Collection
by author or subject
Analisis faktor penyebab keterlambatan pada bangunan tinggi di Surabaya
Manajemen proyek
Analisis ekonomis sebagai dasar pengambilan keputusan dalam penggantian excavator
Marine works with cost estimation for ashkelon desalination project
Perubahan harga BBM terhadap biaya konstruksi rumah sehat sederhana (RSH)
Pengembangan elemen discrete kirchhoff midlin quadrilateral (DKMQ) untuk analisis pelat lipat komposit
Pengaruh beberapa faktor budaya Bali terhadap motivasi kerja pekerja konstruksi, dan perbedaannya pada beberapa proyek di Denpasar
Pengaruh komitmen top manajemen terhadap kinerja proyek melalui kemampuan tim proyek dan desain proyek