Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Studi kasus aplikasi critical path method with multiple calendars pada proyek graha bukopin
Author
Pranoto, Obed Antonio
Additional Author(s)
Gunawan, Fendy Peter
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Jurusan Sipil UK Petra, 2007
Language
Indonesian
ISBN
-
Series
Tugas Akhir No.21121514/SIP/2007
Subject(s)
CONSTRUCTION INDUSTRY-MANAGEMENT
INDUSTRIAL PROJECT MANAGEMENT
Notes
Appendix: p. 106 - 167
Bibliography: p. 105
Abstract
-
Physical Dimension
Number of Page(s)
xiii, 167 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
00883/07
(T) - 658.404 Pra S
Library - 8th Floor
Unavailable : Removed
Similar Collection
by author or subject
Harapan dan realita sistem manajemen mutu ISO 9000 dalam penerapannya di perusahaan kontraktor
Pembuatan model utilitas untuk faktor-faktor internal dalam strategi tender
Analisis faktor-faktor yang mempengaruhi kepuasan konsumen pada produk konstruksi dengan konsep construcability
Studi tentang perencanaan tapak dan analisis hubungan lebar jalan terhadap luas dan harga jual kapling pada beberapa perumahan di Surabaya
Studi tentang komponen-komponen yang terdapat dalam tahapan-tahapan pengembangan perumahan oleh PT."X" di makassar
Project management in construction
Perbandingan produktivitas pekerja konstruksi berdasarkan perbedaan waktu (pagi hari & siang hari)
Modifikasi teknik discrete shear GAP pada elemen balok timoshenko berbasis kriging dan pembentukan elemen makro segitiga pelat reissner-mindlin