Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Studi mengenai produktivitas tenaga kerja di proyek queen victoria
Author
Gustam
Additional Author(s)
Gunawan, Yudi
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Jurusan Sipil UK Petra, 2006
Language
Indonesian
ISBN
-
Series
Tugas Akhir No.20121478/SIP/2006
Subject(s)
CONSTRUCTION INDUSTRY-MANAGEMENT
LABOR PRODUCTIVITY-MEASUREMENT
Notes
Appendix: p. 76 - 142
Bibliography: p. 75
Abstract
-
Physical Dimension
Number of Page(s)
xix, 142 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
05656/06
(T) - 658.314 Gus S
Library - 8th Floor
Unavailable : Removed
Similar Collection
by author or subject
Analisa penjadwalan pekerjaan dinding pra-cetak
Studi tentang faktor-faktor yang mempengaruhi perencanaan site layout proyek konstruksi di Surabaya
Tingkat kepuasan penghuni dalam menempati apartemen sejahtera
Pengaruh penggunaan kombinasi viscosity modifying admixtures dan superplasticizer terhadap rheologi mortar dan beton self compacting concrete
Pengendalian jadwal pada proyek bangunan gedung bertingkat di Surabaya dengan metode earned value management dan earned schedule
Keselamatan kerja pada pelaksanaan penggalian tanah berdasarkan standar osha
Perencanaan site layout proyek konstruksi dengan menggunakan integrated cad-based model
Identifikasi elemen-elemen penghambat dalam penerapan ISO 9002 pada perusahaan konstruksi serta upaya penanggulangannya