Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Studi mengenai produktivitas tenaga kerja di proyek queen victoria
Author
Gustam
Additional Author(s)
Gunawan, Yudi
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Jurusan Sipil UK Petra, 2006
Language
Indonesian
ISBN
-
Series
Tugas Akhir No.20121478/SIP/2006
Subject(s)
CONSTRUCTION INDUSTRY-MANAGEMENT
LABOR PRODUCTIVITY-MEASUREMENT
Notes
Appendix: p. 76 - 142
Bibliography: p. 75
Abstract
-
Physical Dimension
Number of Page(s)
xix, 142 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
05656/06
(T) - 658.314 Gus S
Library - 8th Floor
Unavailable : Removed
Similar Collection
by author or subject
Faktor-faktor lapangan yang mempengaruhi produktivitas pekerja pada proyek konstruksi
Kontrol material pada proyek konstruksi perumahan
Analisa pasar student apartment di Surabaya
Faktor-faktor yang mempengaruhi perancangan produk komponen modular untuk rumah tinggal di Surabaya
Sistem manajemen konstruksi
Analisa kendala pelaksanaan e-procurement di kota Surabaya
Studi tentang implementasi dan pendapat kontraktor terhadap program keselamatan kerja pada proyek mall di Surabaya
Penentuan produktivitas pekerja sebagai dasar penentuan upah (studi kasus pada proyek perkantoran)