Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Studi mengenai produktivitas tenaga kerja di proyek queen victoria
Author
Gustam
Additional Author(s)
Gunawan, Yudi
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Jurusan Sipil UK Petra, 2006
Language
Indonesian
ISBN
-
Series
Tugas Akhir No.20121478/SIP/2006
Subject(s)
CONSTRUCTION INDUSTRY-MANAGEMENT
LABOR PRODUCTIVITY-MEASUREMENT
Notes
Appendix: p. 76 - 142
Bibliography: p. 75
Abstract
-
Physical Dimension
Number of Page(s)
xix, 142 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
05656/06
(T) - 658.314 Gus S
Library - 8th Floor
Unavailable : Removed
Similar Collection
by author or subject
Analisis frekuensi, dampak, dan jenis keterlambatan pada proyek konstruksi
Analisa faktor-faktor yang mendukung brand image terhadap pengembangan realestat di Surabaya
Penyebab,dampak, dan antisipasi change order pada proyek gedung tinggi di Surabaya menurut owner dan kontraktor
Faktor-faktor penghambat value management process pada tahapan konstruksi
Pandangan konsultan perencana terhadap design rework dan aktivitas menunggu pada pekerjaan desain
Studi tentang pengamatan standar waktu dan produktivitas pekerjaan konstruksi
Construction management
Identifikasi dan evaluasi faktor-faktor kompetensi sosial manajer proyek