Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Studi tentang pengamatan standar waktu dan produktivitas pekerjaan konstruksi : Studi kasus pada proyek Ruko Gubeng Station selama Bulan September 2003-Nopember 2003
Author
Wibowo, Amelia Andreana
Additional Author(s)
Saputri, Yennie Ony
Publisher
Surabaya: 2004
Language
Indonesian
ISBN
-
Series
Tugas Akhir No. 1314/SIP/2004
Subject(s)
CONSTRUCTION INDUSTRY-MANAGEMENT
TIME STUDY
Notes
-
Abstract
-
Physical Dimension
Number of Page(s)
xvii, 87 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
01618/04
(T) 690.068 Wib S
Library - 8th Floor
Unavailable : Removed
Similar Collection
by author or subject
Pengaruh dilatasi pada bangunan dengan ketidakberaturan sudut dalam yang didesain secara direct displacement based
Analisis penyebab dan solusi terhadap sisa material batu bata, besi tulangan dan kayu
Analisa rumus empiris kuat tekan kolom dengan penggunaan fiber reinforced polymer pada kondisi : non-burnt, burnt-curing, dan burnt non-curing
Model pengukuran tingkat motivasi dan demotivasi staf teknik perusahaan kontraktor di Surabaya
Proyek Grand City
Faktor-faktor lapangan spesifik dan global yang menyebabkan keterlambatan pada tahapan pekerjaan struktur dan arsitek pada proyek berskala besar
Analisis faktor penyebab, usaha minimalisasi dan program perhitungan sisa material dinding
Construction project administration