Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Studi tentang pengamatan standar waktu dan produktivitas pekerjaan konstruksi : Studi kasus pada proyek Ruko Gubeng Station selama Bulan September 2003-Nopember 2003
Author
Wibowo, Amelia Andreana
Additional Author(s)
Saputri, Yennie Ony
Publisher
Surabaya: 2004
Language
Indonesian
ISBN
-
Series
Tugas Akhir No. 1314/SIP/2004
Subject(s)
CONSTRUCTION INDUSTRY-MANAGEMENT
TIME STUDY
Notes
-
Abstract
-
Physical Dimension
Number of Page(s)
xvii, 87 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
01618/04
(T) 690.068 Wib S
Library - 8th Floor
Unavailable : Removed
Similar Collection
by author or subject
Studi joint risk management pada proyek konstruksi di Surabaya
Studi faktor-faktor penyebab change order pada proyek konstruksi di Surabaya yang menggunakan kontrak traditional serta design-build
Penetapan waktu kerja standard proses pembuatan strain clamp di PT Bina Karya Baru
Marine works with cost estimation for ashkelon desalination project
Analisa penjadwalan pekerjaan dinding pra-cetak
Computer-based construction project management
Penelitian awal penanganan kontraktor terhadap direct waste material pada proyek konstruksi di Surabaya
Perencanaan dan pengendalian jadwal proyek dengan menggunakan metode CPM pada proyek apartemen