Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Penyebab,dampak, dan antisipasi change order pada proyek gedung tinggi di Surabaya menurut owner dan kontraktor
Author
Darwin
Additional Author(s)
Wijaya, Hermawan
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Program Studi Teknik Sipil UK Petra, 2017
Language
Indonesian
ISBN
-
Series
Skripsi No. 21012185/SIP/2017
Subject(s)
CONSTRUCTION INDUSTRY-MANAGEMENT
PROJECT MANAGEMENT
Notes
Appendix: p. 49-54
. Bibliography: p. 47-48 .
Abstract
-
Physical Dimension
Number of Page(s)
xii, 54 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
02662/17
(T) SIP 2185
Library - 8th Floor
Available
Similar Collection
by author or subject
Studi tentang mandor, pekerja, dan kecelakaan kerja pada proyek konstruksi
Essentials of project and systems engineering management
Penelitian tentang pelaksanaan program K3, perkembangan dan hasilnya pada pekerjaan konstruksi beton di Surabaya
Perancangan program pemilihan kontraktor pemenang dalam proses tender pada proyek perumahan di Surabaya
Harapan dan realita sistem manajemen mutu ISO 9000 dalam penerapannya di perusahaan kontraktor
Analisis frekuensi, dampak, dan jenis keterlambatan pada proyek konstruksi
Produktivitas tenaga kerja sebelum dan sesudah perubahan volume pada kontrak di pembangunan proyek rusun Surabaya
Studi kasus perbandingan berbagai bata ringan dari segi material, biaya, dan produktivitas