Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Produktivitas tenaga kerja sebelum dan sesudah perubahan volume pada kontrak di pembangunan proyek rusun Surabaya
Author
Dwipurwanto, Bagus
Additional Author(s)
-
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Magister Teknik Sipil Universitas Kristen Petra, 2016
Language
Indonesian
ISBN
-
Series
Tesis No. 01000228/MTS/2016
Subject(s)
CONSTRUCTION INDUSTRY-LABOR PRODUCTIVITY
CONSTRUCTION INDUSTRY-PERSONNEL MANAGEMENT
CONSTRUCTION INDUSTRY-MANAGEMENT
Notes
Appendix: p. 112-117
. Bibliography: p. 110-111.
Abstract
-
Physical Dimension
Number of Page(s)
xvii, 117 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
00604/17
(T2) MTS 0228
Library - 8th Floor
Unavailable : Removed
Similar Collection
by author or subject
Pengukuran efektifitas dan frekuensi faktor yang mempengaruhi produktivitas pekerja pada pekerjaan finishing proyek rumah tinggal di Surabaya
Studi tentang harga satuan upah pada proyek konstruksi
Perkembangan sustainable construction di Indonesia dan potensi penerapannya pada tahap pelaksanaan
Analisa pengaruh budaya dan sosial terhadap niat konsumen dalam pembelian rumah pada perumahan mewah di Makassar
Hubungan antara kepemimpinan manajer proyek dengan kepercayaan pada proyek konstruksi
Studi tentang faktor-faktor yang menentukan besarnya mark up dalam penerapan teori utilitias pada penawaran konstruksi fisik di Surabaya
Building production and project management
Computer-based construction project management