Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Hubungan overtime dengan produktivitas pekerjaan pembesian (studi kasus pada proyek x, y, dan z)
Author
Santoso, Guntur Budi
Additional Author(s)
Chandra, Januar
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Jurusan Sipil UK Petra, 2006
Language
Indonesian
ISBN
-
Series
Tugas Akhir No.20121487/SIP/2006
Subject(s)
CONSTRUCTION INDUSTRY-MANAGEMENT
CONSTRUCTION INDUSTRY-PERSONNEL MANAGEMENT
Notes
Appendix: p. 76 - 373
Bibliography: p. 75
Abstract
-
Physical Dimension
Number of Page(s)
xix, 373 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
05704/06
(T) - 690.068 San H
-
Unavailable : Removed
Similar Collection
by author or subject
Studi kasus faktor-faktor yang dapat meningkatkan kualitas sdm sebagai modal dasar untuk menciptakan suatu perusahaan yang sehat
Perbandingan sistem tunggal dan sistem ganda struktur baja rangka terbreis konsentris khusus berbentuk V terbalik dengan direct analysis method
Hubungan antara kuantitas pekerjaan dengan durasi pada pekerjanan proyek konstruksi bangunan bertingkat tinggi
Pembuatan model utilitas untuk faktor-faktor internal dalam strategi tender
Perencanaan dan pengendalian jadwal proyek: studi kasus proyek X
Analisa CPM dan bar-chart dengan menggunakan program microsoft project (Studi kasus bangunan kampus ITN 4 lantai di Malang)
Analisa sensitifitas penetapan harga proyek "X" dengan model fair and reasonable markup (FARM)
Studi tentang faktor-faktor penetapan harga produk perumahan di surabaya