Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Analisis sumber daya manusia untuk perencanaan jadwal CPM pada proyek ruko
Author
Moeljono, David
Additional Author(s)
-
Publisher
Surabaya: 2002
Language
Indonesian
ISBN
-
Series
Tugas Akhir No. 1146 S
Subject(s)
CONSTRUCTION INDUSTRY-MANAGEMENT
CONSTRUCTION INDUSTRY-PERSONNEL MANAGEMENT
Notes
-
Abstract
-
Physical Dimension
Number of Page(s)
ix, 34 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
03051/03
(T) 690.0683 Moe A
-
Unavailable : Removed
Similar Collection
by author or subject
Produktivitas alat berat pada pekerjaan galian gedung P1-P2 UK Petra
Strategi sumber daya manusia untuk pekerja konstruksi (staf teknik)
Model simulasi um-cyclone pada operasional perusahaan beton siap pakai (studi kasus PT. Jatim Readymix)
Perbandingan sistem tunggal dan sistem ganda struktur baja rangka terbreis konsentris khusus berbentuk V terbalik dengan direct analysis method
Faktor tidak selesainya pekerjaan pada proyek konstruksi
Analisa dampak kenaikan harga BBM terhadap biaya konstruksi
Identifikasi elemen-elemen penghambat dalam penerapan ISO 9002 pada perusahaan konstruksi serta upaya penanggulangannya
Hubungan antara kepemimpinan manajer proyek dengan kepercayaan pada proyek konstruksi