Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Perbandingan produktivitas pekerja konstruksi berdasarkan perbedaan waktu (pagi hari & siang hari)
Author
Admaja, Handoyo Kusuma
Additional Author(s)
Kangmartono, Sutawijaya
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Jurusan Sipil UK Petra, 2007
Language
Indonesian
ISBN
-
Series
Tugas Akhir No.20401519/SIP/2007
Subject(s)
CONSTRUCTION INDUSTRY-MANAGEMENT
CONSTRUCTION INDUSTRY-PERSONNEL MANAGEMENT
Notes
Apppendix: p. 91 - 143
Bibliography: p. 90
Abstract
-
Physical Dimension
Number of Page(s)
xviii, 143 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
01355/07
(T) - 690.068 Adm P
Library - 8th Floor
Unavailable : Removed
Similar Collection
by author or subject
Studi tentang generic strategy terhadap kontraktor pemula
Inspeksi pelaksanaan bekisting pada proyek konstruksi X
Construction project scheduling and control
Model pengukuran kemampuan manajer proyek berbasis kompetensi
Hubungan antara motivasi dan kinerja para mandor dalam pekerjaan konstruksi di surabaya
Studi tentang faktor-faktor yang mempengaruhi besarnya mark-up pada kontraktor ruko dan perumahan di Surabaya
Studi tentang mandor, pekerja, dan kecelakaan kerja pada proyek konstruksi
Construction planning for engineers