Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Analisis produktivitas jam normal dan jam lembur pada pekerjaan struktur beton bertulang
Author
Palewana, Chrisnadi
Additional Author(s)
Siatanto, Kenny Laureans
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Jurusan Teknik Sipil Universitas Kristen Petra, 2012
Language
Indonesian
ISBN
-
Series
Skripsi No. 21011830/SIP/2012
Subject(s)
CONSTRUCTION INDUSTRY-MANAGEMENT
CONSTRUCTION INDUSTRY-PERSONNEL MANAGEMENT
Notes
Appendix : p. 42 - 85
Bibliography: p. 41
Abstract
-
Physical Dimension
Number of Page(s)
x, 85 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
01886/12
(T) 690.068 Pal A
-
Unavailable : Removed
Similar Collection
by author or subject
Management development
Construction equipment policy
Produktivitas alat berat pada pekerjaan galian gedung P1-P2 UK Petra
Studi perbandingan analisa biaya konstruksi bangunan gedung berdasarkan SNI 2002 dan BOW
Analisa produktivitas pekerjaan bekisting dan pembesian pada beberapa bagian struktur bagian atas
Pengukuran tingkat motivasi dan demotivasi pekerja konstruksi pada suatu proyek di Surabaya
CPM in construction management
Monitoring jadwal suatu proyek sekolah dengan menggunakan metode SPI dan PPC