Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Model pengukuran kemampuan manajer proyek berbasis kompetensi
Author
Orlando, Donny
Additional Author(s)
Tanjaya, Danny
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Jurusan Teknik Sipil Universitas Kristen Petra, 2011
Language
Indonesian
ISBN
-
Series
Skripsi No.21011762/SIP/2011
Subject(s)
LEADERSHIP
CONSTRUCTION INDUSTRY-MANAGEMENT
INDUSTRIAL MANAGEMENT PROJECT
Notes
Appendix : p. 100 - 144
Bibliography : p. 97 - 99
Abstract
-
Physical Dimension
Number of Page(s)
xviii, 144 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
01868/11
(T) 690.068 Orl M
-
Unavailable : Removed
Similar Collection
by author or subject
Perbandingan komposisi pekerja pasangan dinding bata antara SNI 2008 dengan kenyataan di lapangan...
Studi kasus penjadwalan proyek pada proyek rumah toko X menggunakan microsoft project 2010
Kepemimpinan dan pembinaan pemimpin
Analisa pengaruh gaya kepemimpinan otoriter dan lingkungan kerja terhadap kepuasan kerja karyawan departemen room division Swiss-Belinn Hotel Manyar Surabaya
Perencanaan elemen struktur baja berdasarkan SNI 1729 : 2015
Faktor-faktor yang mempengaruhi labor turnover dan dampaknya pada proyek konstruksi di Surabaya
Sikap pemimpin bisnis makanan khas Jawa Timur di wilayah Surabaya Timur terhadap lingkungan eksternal perusahaan
The impact of value engineering in the design and construction process