Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Pengukuran produktivitas pekerjaan dinding lite block dan hebel : studi kasus pada proyek x
Author
Santoso, Erwin
Additional Author(s)
Lelyana, Ivone
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Jurusan Sipil UK Petra, 2007
Language
Indonesian
ISBN
-
Series
Tugas Akhir No.21011558/SIP/2007
Subject(s)
CONSTRUCTION INDUSTRY-MANAGEMENT
TIME STUDY
Notes
Appendix: p. 65 - 127
Bibliography: p. 64
Abstract
-
Physical Dimension
Number of Page(s)
xix, 127 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
03718/07
(T) - 690.068 San P
-
Unavailable : Removed
Similar Collection
by author or subject
Perencanaan keuangan keluarga bapak Irsan pada tabungan, deposito, reksadana pasar uang, reksadana pendapatan tetap, reksadana campuran dan reksadana saham
Studi kasus tentang aspek-aspek pemancangan pada proyek metropolis apartment-Surabaya
Upaya pencapaian target pada unit single line departemen pengemasan di PT. Ulam Tiba Halim
Pembuatan model utilitas untuk faktor-faktor internal dalam strategi tender
Identifikasi kriteria-kriteria prakualifikasi kontraktor serta peringkatnya terhadap kualifiksi kontraktor dalam memenuhi target proyek waktu, biaya, kualitas, keselamatan kerja
Konstruksi: industri, pengelolaan dan rekayasa
Studi kasus pengukuran produktivitas dan pengaruh faktor-faktor pada pekerjaan plafon
Studi tentang pengajuan klaim konstruksi dari kontraktor ke owner