Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Pengukuran produktivitas pekerjaan dinding lite block dan hebel : studi kasus pada proyek x
Author
Santoso, Erwin
Additional Author(s)
Lelyana, Ivone
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Jurusan Sipil UK Petra, 2007
Language
Indonesian
ISBN
-
Series
Tugas Akhir No.21011558/SIP/2007
Subject(s)
CONSTRUCTION INDUSTRY-MANAGEMENT
TIME STUDY
Notes
Appendix: p. 65 - 127
Bibliography: p. 64
Abstract
-
Physical Dimension
Number of Page(s)
xix, 127 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
03718/07
(T) - 690.068 San P
-
Unavailable : Removed
Similar Collection
by author or subject
Perencanaan keuangan keluarga bapak Irsan pada tabungan, deposito, reksadana pasar uang, reksadana pendapatan tetap, reksadana campuran dan reksadana saham
Construction methods and management
Perencanaan tenaga kerja yang efektif pada perusahaan kecap cap jeruk pecel tulen
Model penilaian sukses proyek konstruksi dengan sasaran performa jadwal
Hubungan antara kuantitas pekerjaan dengan durasi pada pekerjanan proyek konstruksi bangunan bertingkat tinggi
Pandangan konsultan perencana mengenai kualitas dokumen desain dan faktor-faktor yang mempengaruhinya
Construction productivity management
Planning and managing interior projects