Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Perencanaan dan pengendalian biaya dan waktu pada suatu proyek konstruksi menggunakan program CCoBMLSE
Author
Santoso, Kevin
Additional Author(s)
Tjandra, Maria Christina
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Jurusan Teknik Sipil Universitas Kristen Petra, 2010
Language
Indonesian
ISBN
-
Series
Skripsi No. 21011731/SIP/2010
Subject(s)
BUILDING-ESTIMATES
CONSTRUCTION INDUSTRY-MANAGEMENT
Notes
Appendix : p. 110 - 114
Bibliography : p. 108 - 109
Abstract
-
Physical Dimension
Number of Page(s)
xvi, 114 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
03176/10
(T) 692.5 San P
Library - 8th Floor
Unavailable : Removed
Similar Collection
by author or subject
Pengukuran produktivitas dan faktor-faktor yang memengaruhi pada pekerjaan konstruksi dengan metode half-slab
Construction methods and management
Design and the economics of building
CPM in construction management
Construction estimates and costs
Penerapan sistem manajemen lingkungan berdasarkan ISO 14000 pada kontraktor-kontraktor di Surabaya
Keselamatan kerja pada pelaksanaan penggalian tanah berdasarkan standar osha
Estimating construction costs