Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Hubungan antara proses kepemimpinan pelaksana proyek dengan ukuran produktivitas mandor pada mall di Surabaya
Author
Limanto, Tommy
Additional Author(s)
Tjandra, Shenny
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Jurusan Sipil UK Petra, 2006
Language
Indonesian
ISBN
-
Series
Tugas Akhir No.20121485/SIP/2006
Subject(s)
LABOR PRODUCTIVITY
LEADERSHIP
CONSTRUCTION INDUSTRY-MANAGEMENT
Notes
Appendix: p. 78 - 106
Bibliography: p. 76 - 77
Abstract
-
Physical Dimension
Number of Page(s)
xix, 106 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
05435/06
(T) - 690.068 Lim H
-
Unavailable : Removed
Similar Collection
by author or subject
Peranan gaya kepemimpinan dalam upaya meningkatkan semangat dan kegairahan kerja karyawan Toserba Gajah di Sidoarjo
Kepemimpinan dalam perusahaan keluarga pada PT. ABC
Usulan implementasi sistem umpan balik360 derajat di perusahaaan konstruksi X
Connecting values to action
Analisa produktivitas pekerjaan pemancangan dan faktor-faktor yang mempengaruhinya dengan metode MPDM pada proyek X di Surabaya
Studi literatur tentang penataan site pada proyek konstruksi bangunan tingkat tinggi
Eliminasi shear locking pada elemen pelat reissner-mindlin berbasis kriging dengan metode discrete shear GAP (DSG)
Identifikasi faktor-faktor yang mempengaruhi "time performance" dari kontraktor proyek ruko di Surabaya