Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Scheduling construction projects : principles and practice
Author
Weber, Sandra Christensen
Additional Author(s)
-
Publisher
Upper Saddle River, NJ: Pearson Prentice-Hall, 2005
Language
English
ISBN
0131148702
Series
Subject(s)
BUILDING-SUPERINTENDENCE
CONSTRUCTION INDUSTRY-MANAGEMENT
PRODUCTION SCHEDULING
Notes
Appendix: p. 297-324
Glossary: p. 285-292
. Index: p. 325-333.
Abstract
-
Physical Dimension
Number of Page(s)
xiv, 333 p.
Dimension
24 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
03153/05
- 690.0685 Web S
Library - 7th Floor
Available
Similar Collection
by author or subject
Manajemen proyek konstruksi
Faktor-faktor yang berperanan dalam penentuan kompensasi pekerja bangunan pada peusahaan kontraktor kelas A di Surabaya yang bergerak di bidang pembangunan gedung
Tantangan yang berpengaruh dan keterampilan manajer proyek pada proyek bangunan hijau
Perencanaan dan pengendalian jadwal proyek: studi kasus proyek X
Planning and managing interior projects
Pengujian elemen cangkang yang terdapat dalam program komersial dengan analisis geometri linier dan nonlinier
Studi kasus perencanaan alokasi kebutuhan bahan pada proyek konstruksi gedung kuliah dan poliklinik Universitas Kristen Petra
Penjadualan dan inventory control produk-produk job order di PT. X Sidoarjo