Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Perancangan sistem perencanaan dan penjadwalan produksi di cv. Toyobo
Author
Arifin, Jimmy Johanes Teguh
Additional Author(s)
-
Publisher
Surabaya: 2003
Language
Indonesian
ISBN
-
Series
Tugas Akhir No. 01/0693/IND/2003
Subject(s)
PRODUCTION PLANNING
PRODUCTION SCHEDULING
Notes
-
Abstract
-
Physical Dimension
Number of Page(s)
xiii, 113 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
01147/04
(T) 658.53 Ari P
-
Unavailable : Lost
Similar Collection
by author or subject
Studi perancanagan pembentukan departemen production planning and control di PT. E.T.A Indonesia
Perancangan pagar lipat dengan menggunakan 3D parametric modularity design dan pembuatan virtual realitynya
Penjadwalan produksi flowshop dengan avolosionary algorithms untuk non unique jobs
Analisa produktivitas di PT. Mercu Gramaron dengan metode omax
Perbaikan inventory dan penjadwalan produksi untuk memenuhi demand di CV. Sukses Bersama Sejahtera
Peningkatan kapasitas produksi dengan pendekatan simulasi di pt. x
Penerapan perencanaan produksi dan kebutuhan material di PT. Graha Cendana Abadi Mitra
Perencanaan kebutuhan bahan baku pada perusahaan meja setrika