Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Perancangan sistem perencanaan dan penjadwalan produksi di cv. Toyobo
Author
Arifin, Jimmy Johanes Teguh
Additional Author(s)
-
Publisher
Surabaya: 2003
Language
Indonesian
ISBN
-
Series
Tugas Akhir No. 01/0693/IND/2003
Subject(s)
PRODUCTION PLANNING
PRODUCTION SCHEDULING
Notes
-
Abstract
-
Physical Dimension
Number of Page(s)
xiii, 113 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
01147/04
(T) 658.53 Ari P
-
Unavailable : Lost
Similar Collection
by author or subject
Peningkatan efisiensi man power melalui pencapaian line balancing dan perbaikan process flow pada spin on filter assembly line 2 di PT X
Perancangan sistem perencanaan produksi dan pengendalian bahan baku di PT Gunungarta Manunggal
LKP : di PT Tjakrindo Mas Surabaya
Analisa perbandingan algoritma genetika dengan algoritma scatter search pada permasalahan penjadwalan flowshop dengan kriteria minimum makespan
Perbaikan lini produksi untuk peningkatan kapasitas pada PT. XYZ
Penggunaan aspek-aspek teknis dan ekonomis sebagai dasar pengukuran tingkat efisiensi di PT Schering Plough Indoensia
Inventory control di PT. XYZ
Perencanaan kebutuhan bahan baku dan penjadwalan produksi