Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Monitoring jadwal suatu proyek sekolah dengan menggunakan metode SPI dan PPC
Author
Sukiman, Vincent
Additional Author(s)
Tjiptorahardjo, Yohanes Y. F.
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Program Studi Teknik Sipil UK Petra, 2016
Language
Indonesian
ISBN
-
Series
Skripsi No. 21012138/SIP/2016
Subject(s)
CONSTRUCTION INDUSTRY-MANAGEMENT
PROJECT MANAGEMENT
INDUSTRIAL PROJECT MANAGEMENT
Notes
Appendix: p. 39-73
. Bibliography: p. 38 .
Abstract
-
Physical Dimension
Number of Page(s)
xvi, 73 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
01006/17
(T) SIP 2138
Library - 8th Floor
Unavailable : Removed
Similar Collection
by author or subject
Studi tentang faktor-faktor penetapan harga produk perumahan di surabaya
Case study of concession contract in the public private partnership
Sebab-sebab dan pengaruh klaim konstruksi di Surabaya
Project management in construction
Studi tentang model strategi penawaran untuk proyek konstruksi di Indonesia
Project management
Penelitian mengenai pengaruh polypropylene fibre pada self compacting concrete terhadap kuat tekan dan kuat tarik
Optimasi site layout pada proyek konstruksi caspian tower dengan menggunakan metode metaheuristik berdasarkan traveling distance pekerja