Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Kajian metode takt time pada proyek konstruksi
Author
Hendy O., Kristoforus
Additional Author(s)
Willson
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Program Studi Teknik Sipil UK Petra, 2017
Language
Indonesian
ISBN
-
Series
Skripsi No. 21012183/SIP/2017
Subject(s)
CONSTRUCTION INDUSTRY-MANAGEMENT
PROJECT MANAGEMENT
Notes
. Bibliography: p. 70-71 .
Abstract
-
Physical Dimension
Number of Page(s)
xiv, 71 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
02668/17
(T) SIP 2183
Library - 8th Floor
Available
Similar Collection
by author or subject
A comprehensive guide to project management schedule and cost control
Studi kasus mengenai aspek-aspek constructability pada suatu proyek apartemen
Hubungan overtime dengan produktivitas pekerjaan pembesian (studi kasus pada proyek x, y, dan z)
Faktor-faktor yang mempengaruhi perancangan produk komponen modular untuk rumah tinggal di Surabaya
Manajemen risiko bidang operasional pada readymix concrete
Studi literatur tentang constructability dalam proyek konstruksi
Usulan penggunaan short interval planning pada proyek konstruksi
Faktor-faktor yang mempengaruhi pelaksanaan pembayaran dalam proyek konstruksi