Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Kajian metode takt time pada proyek konstruksi
Author
Hendy O., Kristoforus
Additional Author(s)
Willson
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Program Studi Teknik Sipil UK Petra, 2017
Language
Indonesian
ISBN
-
Series
Skripsi No. 21012183/SIP/2017
Subject(s)
CONSTRUCTION INDUSTRY-MANAGEMENT
PROJECT MANAGEMENT
Notes
. Bibliography: p. 70-71 .
Abstract
-
Physical Dimension
Number of Page(s)
xiv, 71 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
02668/17
(T) SIP 2183
Library - 8th Floor
Available
Similar Collection
by author or subject
Pengukuran produktivitas dan faktor-faktor yang memengaruhi pada pekerjaan konstruksi dengan metode half-slab
Studi tentang implementasi dan pendapat kontraktor terhadap program keselamatan kerja pada proyek mall di Surabaya
Penentuan produktivitas tenaga kerja pada proyek gudang struktur baja berdasarkan durasi pert (project evaluation review technique)
Penggunaan spreadsheet untuk pengendalian biaya pada proyek "rumah-toko"
Analisa pengaruh budaya dan sosial terhadap niat konsumen dalam pembelian rumah pada perumahan mewah di Makassar
Identifikasi kriteria-kriteria prakualifikasi kontraktor serta peringkatnya terhadap kualifiksi kontraktor dalam memenuhi target proyek waktu, biaya, kualitas, keselamatan kerja
Proyek the twin towers apartment Surabaya
Principles of construction management