Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Kajian metode takt time pada proyek konstruksi
Author
Hendy O., Kristoforus
Additional Author(s)
Willson
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Program Studi Teknik Sipil UK Petra, 2017
Language
Indonesian
ISBN
-
Series
Skripsi No. 21012183/SIP/2017
Subject(s)
CONSTRUCTION INDUSTRY-MANAGEMENT
PROJECT MANAGEMENT
Notes
. Bibliography: p. 70-71 .
Abstract
-
Physical Dimension
Number of Page(s)
xiv, 71 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
02668/17
(T) SIP 2183
Library - 8th Floor
Available
Similar Collection
by author or subject
Infrastructure for the built environment
Standarisasi jenis pekerjaan dalam rab untuk pekerjaan struktur bangunan tinggi di Indonesia
Tantangan yang berpengaruh dan keterampilan manajer proyek pada proyek bangunan hijau
Analisa penyebab, proses administrasi pengaruh change order pada proyek infrastruktur dan bangunan gedung di Ambon
Integrated project management
Studi kasus perencanaan alokasi kebutuhan bahan pada proyek konstruksi gedung kuliah dan poliklinik Universitas Kristen Petra
Aspek-aspek manajemen usaha
Harvard business review on managing projects