Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Kajian metode takt time pada proyek konstruksi
Author
Hendy O., Kristoforus
Additional Author(s)
Willson
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Program Studi Teknik Sipil UK Petra, 2017
Language
Indonesian
ISBN
-
Series
Skripsi No. 21012183/SIP/2017
Subject(s)
CONSTRUCTION INDUSTRY-MANAGEMENT
PROJECT MANAGEMENT
Notes
. Bibliography: p. 70-71 .
Abstract
-
Physical Dimension
Number of Page(s)
xiv, 71 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
02668/17
(T) SIP 2183
Library - 8th Floor
Available
Similar Collection
by author or subject
Analisis prioritas kekritisan rework dan penyebabnya yang terjadi pada suatu proyek sekolah dengan menggunakan metode Failure Modes and Effects Analysis (FMEA)
Studi mengenai faktor-faktor penyebab rework pada proyek-proyek di Surabaya
Tingkat kepentingan dan tingkat kepuasan dari faktor-faktor motivasi pekerja konstruksi
Analisis sisa material konstruksi akibat rework pada pekerjaan finishing proyek rumah tinggal
Construction equipment policy
Evaluasi apartemen High Point dari aspek finansial
Manajemen proyek konstruksi
Potret penerapan perencanaan dan pengendalian jadwal proyek pada suatu kontraktor BUMN