Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Optimasi site layout pada proyek konstruksi caspian tower dengan menggunakan metode metaheuristik berdasarkan traveling distance pekerja
Author
Gosno, Richard Antoni
Additional Author(s)
Evander, Richard
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Program Studi Teknik Sipil UK Petra, 2017
Language
Indonesian
ISBN
-
Series
Skripsi No. 21012177/SIP/2017
Subject(s)
CONSTRUCTION INDUSTRY-MANAGEMENT
PROJECT MANAGEMENT
PLAN LAYOUT
Notes
Appendix: p. 74-134
. Bibliography: p. 68-73 .
Abstract
-
Physical Dimension
Number of Page(s)
xiv, 134 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
02688/17
(T) SIP 2177
Library - 8th Floor
Available
Similar Collection
by author or subject
Construction project administration
Analisis faktor-faktor untuk mengevaluasi kinerja proyek pada perusahaan kontraktor di Surabaya
Studi kasus penerapan rekayasa nilai pada suatu proyek rumah tinggal
Monitoring dan analisis jadwal proyek menggunakan metode performance intensity dan CPM pada proyek hotel
Project management
Penentuan produktivitas tenaga kerja pada proyek gudang struktur baja berdasarkan durasi pert (project evaluation review technique)
Inspeksi fabrikasi dan ereksi pada konstruksi baja proyek gedung P1-P2 UK Petra Surabaya
Pengaruh kepercayaan terhadap kepuasan dan kesuksesan proyek konstruksi