Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Optimasi site layout pada proyek konstruksi caspian tower dengan menggunakan metode metaheuristik berdasarkan traveling distance pekerja
Author
Gosno, Richard Antoni
Additional Author(s)
Evander, Richard
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Program Studi Teknik Sipil UK Petra, 2017
Language
Indonesian
ISBN
-
Series
Skripsi No. 21012177/SIP/2017
Subject(s)
CONSTRUCTION INDUSTRY-MANAGEMENT
PROJECT MANAGEMENT
PLAN LAYOUT
Notes
Appendix: p. 74-134
. Bibliography: p. 68-73 .
Abstract
-
Physical Dimension
Number of Page(s)
xiv, 134 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
02688/17
(T) SIP 2177
Library - 8th Floor
Available
Similar Collection
by author or subject
Perbaikan tata letak fasilitas dengan mempertimbangkan keseimbangan lintasan di PT. X
Analisis sistem manajemen lingkungan (ISO 14000) dan kemungkinan implementasinya oleh para kontraktor kelas A di Surabaya
Analisis nilai produktivitas dan labor utilization rate tenaga kerja dengan metode work sampling
Faktor-faktor permasalahan pengembangan perusahaan kontraktor di Tana Toraja
Tantangan yang berpengaruh dan keterampilan manajer proyek pada proyek bangunan hijau
Penggunaan spreadsheet untuk pengendalian biaya pada proyek "rumah-toko"
Pengaruh beberapa faktor budaya Bali terhadap motivasi kerja pekerja konstruksi, dan perbedaannya pada beberapa proyek di Denpasar
Analisis ekonomis sebagai dasar pengambilan keputusan dalam penggantian excavator