Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Pengukuran produktivitas pekerjaan dinding hebel studi kasus pada proyek apartemen x
Author
Chandra P, Stevanus Cris
Additional Author(s)
Wijaya, Lius Chandra
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Jurusan Teknik Sipil Universitas Kristen Petra, 2010
Language
Indonesian
ISBN
-
Series
Skripsi No. 21011726/SIP/2010
Subject(s)
TIME STUDY
CONSTRUCTION INDUSTRY-MANAGEMENT
Notes
Appendix : p. 46 - 63
Bibliography : p. 45
Abstract
-
Physical Dimension
Number of Page(s)
xi, 63 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
03556/10
(T) 690.068 Cha P
Library - 8th Floor
Unavailable : Removed
Similar Collection
by author or subject
Proporsi komponen biaya harga bahan, upah, dan alat pada proyek konstruksi bangunan tinggi
LKP : perusahaan mie cap burung elang Jl. Rantauan Darat 12 Banjarmasin 70243
Model sumber dan penyebab rework pada tahapan proyek konstruksi
Sistem jaminan kualitas dan biaya kualitas pada proyek tangki elpiji
Perkembangan sustainable construction di Indonesia dan potensi penerapannya pada tahap pelaksanaan
Contractor's management handbook
Legalitas redesign dan shop drawing oleh kontraktor
Desain pengurangan lead time siklus kontrainer untuk mempercepat perputaran stok kontainer di PT X