Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Produktivitas tenaga kerja sebelum dan sesudah perubahan volume pada kontrak untuk proyek pembangunan apartemen X dan hotel Y di Surabaya
Author
Christy W., Albert Valentinus
Additional Author(s)
-
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Magister Teknik Sipil Universitas Kristen Petra, 2016
Language
Indonesian
ISBN
-
Series
Tesis No. 01000227/MTS/2016
Subject(s)
CONSTRUCTION INDUSTRY-LABOR PRODUCTIVITY
CONSTRUCTION INDUSTRY-MANAGEMENT
CONSTRUCTION INDUSTRY-PERSONNEL MANAGEMENT
WORK MEASUREMENT
Notes
Appendix: p. 146-168
. Bibliography: p. 143-145 .
Abstract
-
Physical Dimension
Number of Page(s)
xviii, 168 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
00599/17
(T2) MTS 0227
Library - 8th Floor
Unavailable : Removed
Similar Collection
by author or subject
Perancangan metode pengukuran kinerja jurusan teknik industri Universitas Kristen Petra berdasarkan kriteria MBNQA
Produktivitas tenaga kerja sebelum dan sesudah perubahan volume pada kontrak di pembangunan proyek rusun Surabaya
Construction equipment policy
Evaluasi produktivitas kerja struktur kolom, balok dan plat di proyek Tunjungan Plaza 6
Management development
LKP : PT Glogarindo Surabaya
Survei tingkat kepentingan dan penerapan sumber dan siklus material dari greenship rating tools pada proyek konstruksi
Model matematis hubungan kinerja konsultan dan komunikasi dalam proyek konstruksi