Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Produktivitas tenaga kerja sebelum dan sesudah perubahan volume pada kontrak untuk proyek pembangunan apartemen X dan hotel Y di Surabaya
Author
Christy W., Albert Valentinus
Additional Author(s)
-
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Magister Teknik Sipil Universitas Kristen Petra, 2016
Language
Indonesian
ISBN
-
Series
Tesis No. 01000227/MTS/2016
Subject(s)
CONSTRUCTION INDUSTRY-LABOR PRODUCTIVITY
CONSTRUCTION INDUSTRY-MANAGEMENT
CONSTRUCTION INDUSTRY-PERSONNEL MANAGEMENT
WORK MEASUREMENT
Notes
Appendix: p. 146-168
. Bibliography: p. 143-145 .
Abstract
-
Physical Dimension
Number of Page(s)
xviii, 168 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
00599/17
(T2) MTS 0227
Library - 8th Floor
Unavailable : Removed
Similar Collection
by author or subject
Perancangan pengukuran kinerja di rumah sakit jiwa Menur berdasarkan kriteria human resources focus, business process dan business result
Produktivitas pekerjaan beton bertulang untuk perhitungan harga satuan upah pekerjaan
LKP : PT Classic Prima Carpets Industries Surabaya
Perencanaan kebutuhan bahan baku pada perusahaan meja setrika
A Decision Support for the Long Range Planning in Construction
Pandangan kontraktor dan konsultan manajemen konstruksi terhadap peran pemilik dalam keselamatan kerja proyek konstruksi di Surabaya
The Breeden realty office building construction schedule
Perhitungan produktivitas tenaga kerja pekerjaan bekisting dengan metode level of effort