Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Hubungan antara kuantitas pekerjaan dengan durasi pada pekerjanan proyek konstruksi bangunan bertingkat tinggi
Author
Widiartha, Ika Goldia
Additional Author(s)
Lestari, Abisaq Ayu
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Program Studi Teknik Sipil UK Petra, 2014
Language
Indonesian
ISBN
-
Series
Skripsi No. 21011969/SIP/2014
Subject(s)
CONSTRUCTION INDUSTRY-MANAGEMENT
CONSTRUCTION PROJECTS-MANAGEMENT
Notes
Appendix: p. 64 - 121
. Bibliography: p. 63.
Abstract
-
Physical Dimension
Number of Page(s)
xvii, 121 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
02563/14
(T) SIP 1969
-
Unavailable : Removed
Similar Collection
by author or subject
Principles of construction management
Faktor tidak selesainya pekerjaan pada proyek konstruksi
Sistem optimalisasi penjadwalan linear scheduling method pada proyek saluran irigasi
Sistem jaminan kualitas dan biaya kualitas pada proyek tangki elpiji
Identifikasi dan evaluasi faktor-faktor kompetensi sosial manajer proyek
Analisa rumus empiris kuat tekan kolom dengan penggunaan fiber reinforced polymer pada kondisi : non-burnt, burnt-curing, dan burnt non-curing
Model sistem informasi manajemen dalam pengendalian jadwal proyek
Studi tentang constructability concept berdasarkan sasaran proyek