Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Jenis pekerjaan yang mendominasi komposisi biaya pada proyek apartemen
Author
Kusuma, Eveline Felicia
Additional Author(s)
Sugianto, Budi
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Jurusan Sipil UK Petra, 2009
Language
Indonesian
ISBN
-
Series
Tugas Akhir No.21011675/SIP/2009
Subject(s)
CONSTRUCTION INDUSTRY-MANAGEMENT
Notes
Bibliography : p. 118 - 119
Abstract
-
Physical Dimension
Number of Page(s)
xvi, 119 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
03245/09
(T) 690.068 Kus J
Library - 8th Floor
Unavailable : Removed
Similar Collection
by author or subject
Program simulasi perhitungan kinerja backhoe-dump truck pada pemindahan tanah mekanis
Evaluasi apartemen High Point dari aspek finansial
Pre-contract practice
Fast build
Usulan sistem pengendalian biaya proyek (studi kasus kontraktor a, b dan c di Surabaya)
Studi tentang faktor-faktor yang menentukan perencanaan strategi dalam perusahaan konstruksi
Studi perbandingan sistem dan prosedur di dalam manajemen material dengan manajemen bahan bangunan pada proyek konstruksi "X"
Evaluasi sistem pengendalian biaya proyek pada perusahaan jasa konstruksi berskala besar di Surabaya