Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Usulan sistem pengendalian biaya proyek (studi kasus kontraktor a, b dan c di Surabaya)
Author
Susanto, Fonny Kurniawati
Additional Author(s)
-
Publisher
Surabaya: Program Pascasarjana Teknik Sipil Magister Teknik UK Petra , 2008
Language
Indonesian
ISBN
-
Series
Tugas Akhir No.01000112/MTS/2008
Subject(s)
CONSTRUCTION INDUSTRY-RESEARCH
BUILDING-ESTIMATES
CONSTRUCTION INDUSTRY-MANAGEMENT
Notes
Appendix: p. 124 - 155
Bibliography: p. 123
Abstract
-
Physical Dimension
Number of Page(s)
xv, 155 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
00964/08
(T2) - 692.5 Sus U
Library - 8th Floor
Unavailable : Removed
Similar Collection
by author or subject
Hubungan antara motivasi mandor dan produktivitasnya pada proyek mall di Surabaya
Analisa faktor yang mempengaruhi tahapan investasi pengembang perumahan
Studi tentang perencanaan tapak dan analisis hubungan lebar jalan terhadap luas dan harga jual kapling pada beberapa perumahan di Surabaya
Perbandingan kinerja bangunan yang didesain dengan force-based design dan direct displacement-based design menggunakan SNI gempa 2012
Penerapan material requirement planning pada suatu proyek konstruksi
Optimasi site layout pada proyek konstruksi caspian tower dengan menggunakan metode metaheuristik berdasarkan traveling distance pekerja
Studi literatur tentang prinsip-prinsip lean construction
Creative control of building costs