Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Studi kasus pengukuran produktivitas pekerjaan pemancangan pada proyek x dan faktor-faktor yang mempengaruhinya
Author
Koentjoro, Septian Andri
Additional Author(s)
Diantanu, Charendra Putra
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Jurusan Teknik Sipil Universitas Kristen Petra, 2012
Language
Indonesian
ISBN
-
Series
Skripsi No. 21011866/SIP/2012
Subject(s)
CONSTRUCTION INDUSTRY-MANAGEMENT
CONSTRUCTION INDUSTRY-PERSONNEL MANAGEMENT
PROJECT MANAGEMENT
Notes
Appendix : p. 63 - 75
Bibliography : p. 62
Abstract
-
Physical Dimension
Number of Page(s)
xiii, 75 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
03924/12
(T) 690.068 Koe S
-
Unavailable : Removed
Similar Collection
by author or subject
The Project management office toolkit
Studi kasus aplikasi critical path method with multiple calendars pada proyek graha bukopin
Penelitian tentang pelaksanaan program K3, perkembangan dan hasilnya pada pekerjaan konstruksi beton di Surabaya
Tingkat kepentingan faktor-faktor produktivitas pekerja konstruksi berdasarkan tingkat pengaruh dan tingkat frekuensi
Construction scheduling
Buildings and health
Analisis komparasi dan pengaruh beberapa variabel terhadap kepuasan hunian dan lokasi citra raya dan graha famili
Peranan broker properti dalam pemasaran produk real estate