Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Perbandingan aplikasi progam Microsoft Project dan Primavera dalam penjadwalan proyek konstruksi
Author
Octavia, Icha Kristy
Additional Author(s)
Tandoyo, Elliot Caesar
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Jurusan Teknik Sipil Universitas Kristen Petra, 2013
Language
Indonesian
ISBN
-
Series
Skripsi No. 21011905/SIP/2013
Subject(s)
CONSTRUCTION INDUSTRY-MANAGEMENT
PROJECT MANAGEMENT
Notes
Appendix: p. 83-104
. Bibliography: p. 82.
Abstract
-
Physical Dimension
Number of Page(s)
xi, 104 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
02610/13
(T) 658.404 Oct P
-
Unavailable : Removed
Similar Collection
by author or subject
Kajian awal mengenai peformance intensity (momentum management) untuk mengukur kinerja waktu proyek konstruksi
Sebuah database untuk sistem informasi pada construction site udbc (unified datebase for construction)
Modifikasi teknik discrete shear GAP pada elemen balok timoshenko berbasis kriging dan pembentukan elemen makro segitiga pelat reissner-mindlin
Pengaruh penggunaan kombinasi viscosity modifying admixtures dan superplasticizer terhadap rheologi mortar dan beton self compacting concrete
Penyebab,dampak, dan antisipasi change order pada proyek gedung tinggi di Surabaya menurut owner dan kontraktor
Faktor-faktor yang berperanan dalam penentuan kompensasi pekerja bangunan pada peusahaan kontraktor kelas A di Surabaya yang bergerak di bidang pembangunan gedung
Faktor-faktor yang mempengaruhi labor turnover dan dampaknya pada proyek konstruksi di Surabaya
The Toyota product development system