Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Sistem perencanaan dan penjadwalan linear untuk proyek bangunan industri pergudangan
Author
Pangestu, David
Additional Author(s)
-
Publisher
Surabaya: Program Pascasarjana Teknik Sipil Magister Teknik UK Petra , 2010
Language
Indonesian
ISBN
-
Series
Tugas Akhir No. 01000141/MTS/2010
Subject(s)
CONSTRUCTION INDUSTRY-MANAGEMENT
PROJECT MANAGEMENT
Notes
Appendix : p. 74 - 129
. Bibliography: p. 73.
Abstract
-
Physical Dimension
Number of Page(s)
xiv, 129 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
00535/10
(T2) 658.404 Pan S
-
Unavailable : Removed
Similar Collection
by author or subject
Faktor demotivasi pekerja dan dampaknya pada beberapa proyek konstruksi di Surabaya
Analisa percepatan durasi aktivitas sebagai antisipasi keterlambatan proyek
Studi mengenai penerapan manajemen risiko oleh perusahaan kontraktor di Surabaya
Perbandingan aplikasi progam Microsoft Project dan Primavera dalam penjadwalan proyek konstruksi
Kepuasan mandor terhadap pola komunikasi pada proyek perumahan
The Project resource manual
Analisa produktivitas pekerjaan pemancangan dan faktor-faktor yang mempengaruhinya dengan metode MPDM pada proyek X di Surabaya
The project management office toolkit