Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Penyiapan bill of quantity untuk estimasi biaya pekerjaan konstruksi baja
Author
Hartanto, Andrie Wibowo
Additional Author(s)
Sie, William Leowanto
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Jurusan Sipil UK Petra, 2007
Language
Indonesian
ISBN
-
Series
Tugas Akhir No.21011553/SIP/2007
Subject(s)
BUILDING-ESTIMATES
CONSTRUCTION INDUSTRY-MANAGEMENT
Notes
Appendix: p. 70 - 82
Bibliography: p. 69
Abstract
-
Physical Dimension
Number of Page(s)
xix, 82 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
03716/07
(T) - 692.5 Har P
Library - 8th Floor
Unavailable : Removed
Similar Collection
by author or subject
Risk management pada perusahaan kontraktor yang menangani proyek pemerintah
Studi perbandingan sistem dan prosedur di dalam manajemen material dengan manajemen bahan bangunan pada proyek konstruksi "X"
Pengaruh kepercayaan terhadap kepuasan dan kesuksesan proyek konstruksi
Manajemen proyek konstruksi
Studi kasus produktivitas pekerjaan produksi dan pemasangan dinding precast pada proyek apartemen
Kajian awal mengenai peformance intensity (momentum management) untuk mengukur kinerja waktu proyek konstruksi
Construction methods and management
Rencana anggaran biaya "perkantoran"