Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
LKP : gedung Kampus ITATS
Author
Berlyanto S., Nieno
Additional Author(s)
Putu S., Dewa
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Jurusan Sipil UK Petra, 1995
Language
Indonesian
ISBN
-
Series
Laporan kerja praktek direksi; KP-27 D3K
Subject(s)
CONSTRUCTION INDUSTRY-MANAGEMENT
TIME MANAGEMENT
Notes
-
Abstract
-
Physical Dimension
Number of Page(s)
v, 42 p.
Dimension
32
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
01779/96
L 624 Ber L/d
Library - 6th Floor
Available
Similar Collection
by author or subject
Sistem perencanaan dan penjadwalan linear untuk proyek bangunan industri pergudangan
Information methods
Manajemen proyek konstruksi
Studi literatur tentang prinsip-prinsip lean construction
Analisis komparasi dan pengaruh beberapa variabel terhadap kepuasan hunian dan lokasi citra raya dan graha famili
Analisis produktivitas jam normal dan jam lembur pada pekerjaan struktur beton bertulang
Analisa standar penilaian kualitas conquas pekerjaan finishing untuk proyek konstruksi di Surabaya
Sistem jaminan kualitas dan biaya kualitas pada proyek tangki elpiji