Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
LKP : gedung Kampus ITATS
Author
Berlyanto S., Nieno
Additional Author(s)
Putu S., Dewa
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Jurusan Sipil UK Petra, 1995
Language
Indonesian
ISBN
-
Series
Laporan kerja praktek direksi; KP-27 D3K
Subject(s)
CONSTRUCTION INDUSTRY-MANAGEMENT
TIME MANAGEMENT
Notes
-
Abstract
-
Physical Dimension
Number of Page(s)
v, 42 p.
Dimension
32
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
01779/96
L 624 Ber L/d
Library - 6th Floor
Available
Similar Collection
by author or subject
Quality improvement techniques in construction
Project management in construction
Strategy in working capital management under adverse economic condition: a case study of Indonesia construction smes
Aplikasi program primavera project planner pada perencanaan dan penjadwalan proyek rusun
Faktor-faktor kesuksesan proyek berdasarkan pendapat manajer proyek
Mengatur waktu secara efektif
Analisa dan evaluasi sisa material konstruksi pada pembangunan ruko di Surabaya
Harapan dan realita sistem manajemen mutu ISO 9000 dalam penerapannya di perusahaan kontraktor