Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Perbandingan komposisi pekerja pasangan dinding bata antara SNI 2008 dengan kenyataan di lapangan...
Author
Tjahjadi, Stanislaus
Additional Author(s)
Christian, Yonathan Hans
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Jurusan Teknik Sipil Universitas Kristen Petra, 2013
Language
Indonesian
ISBN
-
Series
Skripsi No. 21011908/SIP/2013
Subject(s)
CONSTRUCTION INDUSTRY-MANAGEMENT
Notes
Appendix: p. 32-44
. Bibliography: p. 31 .
Abstract
-
Physical Dimension
Number of Page(s)
xvii, 44 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
02616/13
(T) 690.068 Tja P
-
Unavailable : Removed
Similar Collection
by author or subject
Studi tentang pengamatan standar waktu dan produktivitas pekerjaan konstruksi
Formwork
Identifikasi faktor-faktor yang mempengaruhi "time performance" dari kontraktor proyek ruko di Surabaya
Motivasi kerja pekerja pada beberapa proyek konstruksi di Surabaya
Analisis produktivitas jam normal dan jam lembur pada pekerjaan struktur beton bertulang
Faktor-faktor kesuksesan proyek berdasarkan pendapat manajer proyek
Pengukuran produktivitas pekerjaan dinding lite block dan hebel : studi kasus pada proyek x
Penanganan sisa material ready-mixed concrete pada proyek konstruksi