Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Faktor resiko yang kritis pada proyek water supply dan power plant dengan pola bot di Indonesia
Author
Saptarini, Dyah Wahyuti
Additional Author(s)
-
Publisher
Surabaya: 2003
Language
Indonesian
ISBN
-
Series
Tesis No. 061/MTS/2003
Subject(s)
CONSTRUCTION INDUSTRY-FINANCE
CONSTRUCTION INDUSTRY-MANAGEMENT
Notes
-
Abstract
-
Physical Dimension
Number of Page(s)
xi, 80 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
00702/04
(T2) 690.068 Sap F
-
Unavailable : Removed
Similar Collection
by author or subject
Analisis pengaruh variabel lokasi, produk, harga, promosi, pelayanan dan desain terhadap minat konsumen factory outlet di Surabaya
Analisis kriteria kinerja konsultan perencana
Fast build
Persepsi pekerja terhadap sistem manajemen keselamatan pada proyek konstruksi di Surabaya
Principles of construction management for engineers and managers
Faktor-faktor kesuksesan proyek berdasarkan pendapat manajer proyek
Proyek Grand City
Diskriminasi terhadap karier wanita dalam perusahaan kontraktor