Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Marine works with cost estimation for ashkelon desalination project
Author
Polisar, Ivandy
Additional Author(s)
Wicaksono, Andreas
Publisher
Surabaya: 2003
Language
Indonesian
ISBN
-
Series
Tugas Akhir No. 1268/SIP/2003
Subject(s)
BUILDING-ESTIMATES
CONSTRUCTION INDUSTRY-MANAGEMENT
Notes
-
Abstract
-
Physical Dimension
Number of Page(s)
xvii, 165 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
03648/03
(T) 692.5 Pol M
Library - 8th Floor
Under maintenance
Similar Collection
by author or subject
Pelaksanaan metode updating dan pemakaian grafik kontrol kemajuan phisik untuk proyek konstruksi
Studi kasus terjadinya cacat konstruksi dengan pendekatan human error pada proyek gedung bertingkat
Potret penerapan perencanaan dan pengendalian jadwal proyek pada suatu kontraktor BUMN
Jenis pekerjaan yang mendominasi komposisi biaya pada proyek apartemen
Prediksi kinerja waktu proyek konstruksi
Studi joint risk management pada proyek konstruksi di Surabaya
Managing construction equipment
Studi tentang faktor-faktor penentu dalam pemilihan jenis kontrak untuk proyek konstruksi