Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Marine works with cost estimation for ashkelon desalination project
Author
Polisar, Ivandy
Additional Author(s)
Wicaksono, Andreas
Publisher
Surabaya: 2003
Language
Indonesian
ISBN
-
Series
Tugas Akhir No. 1268/SIP/2003
Subject(s)
BUILDING-ESTIMATES
CONSTRUCTION INDUSTRY-MANAGEMENT
Notes
-
Abstract
-
Physical Dimension
Number of Page(s)
xvii, 165 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
03648/03
(T) 692.5 Pol M
Library - 8th Floor
Under maintenance
Similar Collection
by author or subject
Studi harga satuan dengan metode probabilistic pada proyek rumah tinggal
Legalitas redesign dan shop drawing oleh kontraktor
Analisa aspek-aspek dalam prosedur change order pada proyek konstruksi
Jenis pekerjaan yang mendominasi komposisi biaya pada proyek apartemen
Studi tentang perencanaan tapak dan analisis hubungan lebar jalan terhadap luas dan harga jual kapling pada beberapa perumahan di Surabaya
Cara pendekatan perhitungan kuantitas pembesian pada balok struktur beton bertulang
Analisa prosentase biaya dan harga tiap satuan luas dari bangunan gedung
Evaluasi penilaian 5S di area penyimpanan proyek konstruksi