Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Marine works with cost estimation for ashkelon desalination project
Author
Polisar, Ivandy
Additional Author(s)
Wicaksono, Andreas
Publisher
Surabaya: 2003
Language
Indonesian
ISBN
-
Series
Tugas Akhir No. 1268/SIP/2003
Subject(s)
BUILDING-ESTIMATES
CONSTRUCTION INDUSTRY-MANAGEMENT
Notes
-
Abstract
-
Physical Dimension
Number of Page(s)
xvii, 165 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
03648/03
(T) 692.5 Pol M
Library - 8th Floor
Under maintenance
Similar Collection
by author or subject
Model sumber dan penyebab rework pada tahapan proyek konstruksi
Analisa pengaruh elemen lansekap terhadap nilai properti berdasarkan persepsi penghuni di kawasan perumahan Surabaya Timur dan Surabaya Barat
Ruko-Bank Exim Surabaya
Hubungan antara motivasi dan kinerja para mandor dalam pekerjaan konstruksi di surabaya
Time, cost and architecture
Identifikasi faktor-faktor kritis pada proyek kerjasama operasi, studi kasus pada proyek jalan layang waru dan bandara juanda
Estimating construction costs
Usulan implementasi sistem umpan balik360 derajat di perusahaaan konstruksi X