Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Faktor demotivasi staf profesional pada perusahaan kontraktor di Surabaya
Author
Abadi, Yonathan Kusuma
Additional Author(s)
Dermawan, Rudy
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Jurusan Sipil UK Petra, 2007
Language
Indonesian
ISBN
-
Series
Tugas Akhir No.12301518/SIP/2007
Subject(s)
CONSTRUCTION INDUSTRY-MANAGEMENT
MOTIVATION IN MANAGEMENT
Notes
Appendix: p. 44 - 54
Bibliography: p. 42 - 43
Abstract
-
Physical Dimension
Number of Page(s)
xvi, 54 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
00762/07
(T) - 658.314 Aba F
Library - 8th Floor
Unavailable : Removed
Similar Collection
by author or subject
Simplified guide to construction management for architects and engineers
Penentuan buffer sizing dalam penerapan critical chain project management pada sebuah proyek konstruksi
Marine works with cost estimation for ashkelon desalination project
Studi optimasi perencanaan site layout pada proyek konstruksi dengan menggunakan program quantitative system verson 3.0
Studi tentang generic strategy terhadap kontraktor pemula
Model pengendalian biaya dan resiko (pada perumahan graha famili, Surabaya)
Identifikasi kriteria-kriteria prakualifikasi kontraktor serta peringkatnya terhadap kualifiksi kontraktor dalam memenuhi target proyek waktu, biaya, kualitas, keselamatan kerja
Analisis jadwal pelaksanaan pekerjaan struktur proyek 6 lantai dengan menggunakan program microsoft project 2003