Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Analisis jadwal pelaksanaan pekerjaan struktur proyek 6 lantai dengan menggunakan program microsoft project 2003
Author
Sutanto, Agus Salim
Additional Author(s)
Ongkowijoyo, Hariono
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Jurusan Sipil UK Petra, 2008
Language
Indonesian
ISBN
-
Series
Tugas Akhir No.21011613/SIP/2008
Subject(s)
INDUSTRIAL PROJECT MANAGEMENT-COMPUTER PROGRAMS
CONSTRUCTION INDUSTRY-MANAGEMENT
Notes
Appendix
Bibliography: p. 68
Abstract
-
Physical Dimension
Number of Page(s)
xvii, 68 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
04663/08
(T) - 658.404 Sut A
Library - 8th Floor
Unavailable : Removed
Similar Collection
by author or subject
Studi tentang faktor-faktor yang mempengaruhi besarnya mark-up pada kontraktor ruko dan perumahan di Surabaya
Proyek Grand City
Analisa dan evaluasi sisa material konstruksi pada pembangunan ruko di Surabaya
Pandangan konsultan perencana terhadap design rework dan aktivitas menunggu pada pekerjaan desain
A survey of progress characteristics of construction projects in Thailand and Indonesia
Pengaruh keterlambatan proyek terhadap pembengkaan biaya proyek
Faktor-faktor penghambat kontraktror untuk melaksanakan k3 pada proyek konstruksi
Usulan perancangan sistem informasi manajemen pengendalian mutu pekerjaan beton konvensional di perusahaan jasa konstruksi