Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Penentuan buffer sizing dalam penerapan critical chain project management pada sebuah proyek konstruksi
Author
Suyansen, Christian Hadisurya
Additional Author(s)
Martanto, William Sandika
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Program Studi Teknik Sipil UK Petra, 2014
Language
Indonesian
ISBN
-
Series
Skripsi No. 21011975/SIP/2014
Subject(s)
CONSTRUCTION INDUSTRY-MANAGEMENT
PROJECT MANAGEMENT
Notes
. Bibliography: p. 74 - 76.
Abstract
-
Physical Dimension
Number of Page(s)
xix, 76 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
02596/14
(T) SIP 1975
-
Unavailable : Removed
Similar Collection
by author or subject
Analisa durasi rencana aktivitas dan evaluasi pelaksanaan jadwal pada suatu proyek konstruksi gedung bertingkat (studi kasus pada proyek "X")
Model pengukuran tingkat motivasi dan demotivasi staf teknik perusahaan kontraktor di Surabaya
Menghitung umur penggantian berat yang optimum dengan biaya daur kehidupan yang minimum
Analisis faktor-faktor untuk mengevaluasi kinerja proyek pada perusahaan kontraktor di Surabaya
Kepuasan mandor terhadap pola komunikasi pada proyek perumahan
Penerapan program dinamis probabilistik pada manajemen proyek konstruksi
Penggunaan spreadsheet untuk pengendalian biaya pada proyek "rumah-toko"
Six sigma team dynamics