Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Penentuan buffer sizing dalam penerapan critical chain project management pada sebuah proyek konstruksi
Author
Suyansen, Christian Hadisurya
Additional Author(s)
Martanto, William Sandika
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Program Studi Teknik Sipil UK Petra, 2014
Language
Indonesian
ISBN
-
Series
Skripsi No. 21011975/SIP/2014
Subject(s)
CONSTRUCTION INDUSTRY-MANAGEMENT
PROJECT MANAGEMENT
Notes
. Bibliography: p. 74 - 76.
Abstract
-
Physical Dimension
Number of Page(s)
xix, 76 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
02596/14
(T) SIP 1975
-
Unavailable : Removed
Similar Collection
by author or subject
Kajian metode takt time pada proyek konstruksi
Analisa aspek-aspek yang mempengaruhi koordinasi pada pelaksanaan Proyek X
Studi kasus aplikasi critical path method with multiple calendars pada proyek graha bukopin
Engineering construction risks
Penerapan approximate cost estimate pada struktur beton bertulang bangunan ruko (SOHO)
Studi optimasi perencanaan site layout pada proyek konstruksi dengan menggunakan program quantitative system verson 3.0
Analisis faktor penyebab, usaha minimalisasi dan program perhitungan sisa material dinding
Penggunaan linear programming dan genetic algorithms dalam menyelesaikan time-cost trade-off problem