Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Penggunaan linear programming dan genetic algorithms dalam menyelesaikan time-cost trade-off problem
Author
Septianus, Andy
Additional Author(s)
Laorent, Danny
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Program Studi Teknik Sipil UK Petra, 2013
Language
Indonesian
ISBN
-
Series
Skripsi No. 21011943/SIP/2013
Subject(s)
CONSTRUCTION INDUSTRY MANAGEMENT
PROJECT MANAGEMENT
Notes
-
. Bibliography: p. 130-132 .
Abstract
-
Physical Dimension
Number of Page(s)
xiv, 132 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
01404/14
(T) SIP 1943
-
Unavailable : Removed
Similar Collection
by author or subject
Penerapan program dinamis probabilistik pada manajemen proyek konstruksi
Perbandingan harga satuan pekerjaan berdasarkan analisa biaya konstruksi bangunan gedung dan rumah tinggal SNI 2002 dan 2008
Perencanaan dan pengendalian proyek PT. Triple's dalam pembangunan gedung kantor unit pelayanan PT PLN di Jatirogo
Permodelan penjadwalan linier dengan alokasi sumber daya manusia pada proyek perumahan
Analisa frekuensi dan penyebab change order pada proyek apartemen di Surabaya
Proyek the twin towers apartment Surabaya
Analisa karakteristik pemilihan supplier beton ready-mix bekisting, dan tulangan baja oleh perusahaan kontraktor dan owner di Surabaya berdasarkan tingkat kepentingan kriteria
Studi tentang implementasi dan pendapat kontraktor terhadap program keselamatan kerja pada proyek mall di Surabaya