Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Monitoring dan analisis jadwal proyek menggunakan metode performance intensity dan CPM pada proyek hotel
Author
Setiadi, Ivan P.
Additional Author(s)
-
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Magister Teknik Sipil Universitas Kristen Petra, 2015
Language
Indonesian
ISBN
-
Series
Tesis No. 01000199/MTS/2015
Subject(s)
CONSTRUCTION INDUSTRY-MANAGEMENT
INDUSTRIAL PROJECT-MANAGEMENT
PROJECT MANAGEMENT
Notes
Appendix: p. 55-166
. Bibliography: p. 54.
Abstract
-
Physical Dimension
Number of Page(s)
xiii, 166 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
02431/15
(T2) MTS 0199
-
Unavailable : Removed
Similar Collection
by author or subject
Studi awal penerapan teory fuzzy set dalam memilih kontraktor pemenang tender
Elemen segitiga berbasis kriging dengan tegangan kontinu pada titik nodal
The power of design-build
Pengembangan elemen discrete kirchhoff midlin quadrilateral (DKMQ) untuk analisis pelat lipat komposit
How to plan any project
Managing the unknown
Penelitian tentang pelaksanaan program K3, perkembangan dan hasilnya pada pekerjaan konstruksi beton di Surabaya
Analisa pengambilan keputusan pada perusahaan realestat menghadapi masa krisis