Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Monitoring dan analisis jadwal proyek menggunakan metode performance intensity dan CPM pada proyek hotel
Author
Setiadi, Ivan P.
Additional Author(s)
-
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Magister Teknik Sipil Universitas Kristen Petra, 2015
Language
Indonesian
ISBN
-
Series
Tesis No. 01000199/MTS/2015
Subject(s)
CONSTRUCTION INDUSTRY-MANAGEMENT
INDUSTRIAL PROJECT-MANAGEMENT
PROJECT MANAGEMENT
Notes
Appendix: p. 55-166
. Bibliography: p. 54.
Abstract
-
Physical Dimension
Number of Page(s)
xiii, 166 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
02431/15
(T2) MTS 0199
-
Unavailable : Removed
Similar Collection
by author or subject
Analisis faktor-faktor yang mempengaruhi kepuasan konsumen pada produk konstruksi dengan konsep construcability
Pengukuran produktivitas dan faktor-faktor yang memengaruhi pada pekerjaan konstruksi dengan metode half-slab
Penelitian awal tentang sisa material konstruksi pada perusahaan kontraktor di Surabaya
Studi kasus aplikasi critical path method with multiple calendars pada proyek graha bukopin
Penentuan produktivitas pekerja sebagai dasar penentuan upah (studi kasus pada proyek perkantoran)
Faktor-faktor penghambat value management process pada tahapan konstruksi
Cara pendekatan perhitungan kuantitas pembesian pada balok struktur beton bertulang
Project management