Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Produktifitas pekerjaan jacked pile driving dan faktor-faktor yang mempengaruhinya
Author
Prakasa, Tigor
Additional Author(s)
Alexander, Jourdan
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Jurusan Sipil UK Petra, 2009
Language
Indonesian
ISBN
-
Series
Tugas Akhir No.21011684/SIP/2009
Subject(s)
CONSTRUCTION INDUSTRY-MANAGEMENT
Notes
Appendix : p. 73 - 98
Bibliography : p. 72
Abstract
-
Physical Dimension
Number of Page(s)
xvii, 98 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
02782/09
(T) 690.068 Pra P
Library - 8th Floor
Unavailable : Removed
Similar Collection
by author or subject
Analisis faktor penyebab, usaha minimalisasi dan program perhitungan sisa material dinding
Manajemen proyek konstruksi
Pengukuran produktivitas pekerjaan dinding hebel studi kasus pada proyek apartemen x
Pengaruh tindakan tidak aman (unsafe act) dan kondisi tidak aman (usafe condiition) terhadap kecelakaan kerja konstruksi
Construction extension to the PMBOK guide third edition
Construction productivity management
Program simulasi perhitungan kinerja backhoe-dump truck pada pemindahan tanah mekanis
Studi literatur tentang berbagai macam sertifikasi di dunia konstruksi