Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Produktifitas pekerjaan jacked pile driving dan faktor-faktor yang mempengaruhinya
Author
Prakasa, Tigor
Additional Author(s)
Alexander, Jourdan
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Jurusan Sipil UK Petra, 2009
Language
Indonesian
ISBN
-
Series
Tugas Akhir No.21011684/SIP/2009
Subject(s)
CONSTRUCTION INDUSTRY-MANAGEMENT
Notes
Appendix : p. 73 - 98
Bibliography : p. 72
Abstract
-
Physical Dimension
Number of Page(s)
xvii, 98 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
02782/09
(T) 690.068 Pra P
Library - 8th Floor
Unavailable : Removed
Similar Collection
by author or subject
Perencanaan dan penjadwalan sumber daya manusia pada proyek konstruksi dengan program primavera
Sistem informasi manajemen untuk pengendalian biaya proyek PT. "ABC" pada proyek "X"
Project management
Sistem perencanaan dan penjadwalan linear untuk proyek bangunan industri pergudangan
Analisa teori value chain terhadap kompetensi pada perusahaan kontraktor kelas a di Surabaya
Manajemen konstruksi
Penanganan sisa material ready-mixed concrete pada proyek konstruksi
Analisis biaya elemental untuk perencanaan biaya proyek hotel