Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Produktifitas pekerjaan jacked pile driving dan faktor-faktor yang mempengaruhinya
Author
Prakasa, Tigor
Additional Author(s)
Alexander, Jourdan
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Jurusan Sipil UK Petra, 2009
Language
Indonesian
ISBN
-
Series
Tugas Akhir No.21011684/SIP/2009
Subject(s)
CONSTRUCTION INDUSTRY-MANAGEMENT
Notes
Appendix : p. 73 - 98
Bibliography : p. 72
Abstract
-
Physical Dimension
Number of Page(s)
xvii, 98 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
02782/09
(T) 690.068 Pra P
Library - 8th Floor
Unavailable : Removed
Similar Collection
by author or subject
Studi mengenai faktor-faktor yang dapat meningkatkan produktivitas konstruksi di Surabaya
Perencanaan dan penjadwalan sumber daya manusia pada proyek konstruksi dengan program primavera
Analisa life cycle cost pada gedung manajemen perhotelan Universitas Kristen Petra
Analisis diskriminan dan aplikasi analytical hierarchy process untuk menghitung faktor-faktor yang mempengaruhi mark-up penawaran
LKP : gedung Kampus ITATS
Evaluasi penilaian 5S di area penyimpanan proyek konstruksi
Analisa konfik dalam perusahaan kontraktor
Studi tentang faktor-faktor yang menentukan perencanaan strategi dalam perusahaan konstruksi