Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Pengaruh keterlambatan proyek terhadap pembengkaan biaya proyek
Author
Wahyudi, Riswanto
Additional Author(s)
Yono, Chandra Indra
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Jurusan Sipil UK Petra, 2006
Language
Indonesian
ISBN
-
Series
Tugas Akhir No.20301481/SIP/2006
Subject(s)
CONSTRUCTION INDUSTRY-MANAGEMENT
Notes
Appendix:
Bibliography: p. 56
Abstract
-
Physical Dimension
Number of Page(s)
viii, 56 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
05663/06
(T) - 658.924 Wah P
Library - 8th Floor
Unavailable : Removed
Similar Collection
by author or subject
Analisis waktu pekerjaan finishing pada proyek apartemen
Manajemen konstruksi
Principles of construction management for engineers and managers
Penerapan quality function deployment dalam bidang konstruksi
Studi perbandingan analisa biaya konstruksi bangunan gedung berdasarkan SNI 2002 dan BOW
Standarisasi jenis pekerjaan dalam rab untuk pekerjaan struktur bangunan tinggi di Indonesia
Analisis faktor-faktor yang mempengaruhi perpindahan pelaksana tetap pada perusahaan kontraktor di Surabaya
Faktor sukses kunci bagi kontraktor perumahan pada real estate