Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Pengaruh keterlambatan proyek terhadap pembengkaan biaya proyek
Author
Wahyudi, Riswanto
Additional Author(s)
Yono, Chandra Indra
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Jurusan Sipil UK Petra, 2006
Language
Indonesian
ISBN
-
Series
Tugas Akhir No.20301481/SIP/2006
Subject(s)
CONSTRUCTION INDUSTRY-MANAGEMENT
Notes
Appendix:
Bibliography: p. 56
Abstract
-
Physical Dimension
Number of Page(s)
viii, 56 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
05663/06
(T) - 658.924 Wah P
Library - 8th Floor
Unavailable : Removed
Similar Collection
by author or subject
Legalitas redesign dan shop drawing oleh kontraktor
Penanganan sisa material ready-mixed concrete pada proyek konstruksi
Analisis student center universitas Kristen Petra berdasarkan survai minat mahasiswa dan studi desain, dengan beberapa aspek pasar dan finansial
Perhitungan produktivitas tenaga kerja pekerjaan bekisting dengan metode level of effort
Perencanaan dan pengendalian jadwal proyek dengan menggunakan metode CPM pada proyek apartemen
Construction project planning and scheduling
Proyek Grand City
Analisa aspek-aspek dalam prosedur change order pada proyek konstruksi