Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Pengaruh keterlambatan proyek terhadap pembengkaan biaya proyek
Author
Wahyudi, Riswanto
Additional Author(s)
Yono, Chandra Indra
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Jurusan Sipil UK Petra, 2006
Language
Indonesian
ISBN
-
Series
Tugas Akhir No.20301481/SIP/2006
Subject(s)
CONSTRUCTION INDUSTRY-MANAGEMENT
Notes
Appendix:
Bibliography: p. 56
Abstract
-
Physical Dimension
Number of Page(s)
viii, 56 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
05663/06
(T) - 658.924 Wah P
Library - 8th Floor
Unavailable : Removed
Similar Collection
by author or subject
Motivasi kerja pekerja pada beberapa proyek konstruksi di Surabaya
Uji aplikasi program CCoBML (civil construction bill of quantity, material, and labour) untuk proyek konstruksi
Analisa pasar student apartment di Surabaya
Studi kasus perbandingan biaya perancah kayu, gelam dan besi pada proyek ruko di Surabaya
Faktor-faktor manusia yang mempengaruhi penolakan SDM dalam menjalankan sistem informasi berbasis teknologi informasi (studi pada SDM perusahaan konstruksi di Surabaya)
Faktor demotivasi pekerja dan dampaknya pada beberapa proyek konstruksi di Surabaya
Studi tentang analisa pembengkakan biaya dan waktu pada proyek konstruksi real estate
Evaluasi penilaian 5S di area penyimpanan proyek konstruksi