Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Perencanaan dan pengendalian jadwal proyek dengan menggunakan metode CPM pada proyek apartemen
Author
Kennardi, Christian
Additional Author(s)
Setiadi, Ivan Pratama
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Jurusan Teknik Sipil Universitas Kristen Petra, 2013
Language
Indonesian
ISBN
-
Series
Skripsi No. 21011887/SIP/2012
Subject(s)
CONSTRUCTION INDUSTRY-MANAGEMENT
PROJECT MANAGEMENT
Notes
Appendix : p. 107 - 125
Bibliography : p. 106
Abstract
-
Physical Dimension
Number of Page(s)
xixi, 125 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
00911/13
(T) 658.404 Ken P
Library - 8th Floor
Unavailable : Removed
Similar Collection
by author or subject
Using the project management maturity model
Kepercayaan sebagai salah satu faktor kepuasan kerja untuk mencapai keberhasilan proyek perumahan
How to plan any project
Construction planning, programming and control
Model faktor-faktor penyebab dan dampak keterlambatan proyek konstruksi di Surabaya
Penerapan faktor-faktor sukses kunci yang menunjang keberhasilan suatu proyek apartemen
Program p3-tc untuk perhitungan waktu efektif penggunaan tower crane pada konstruksi bangunan bertingkat
Identifikasi nvaau dan studi vsm pada proyek X di Surabaya