Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Analisa aspek-aspek dalam prosedur change order pada proyek konstruksi
Author
Kosasi, Michael Halmar
Additional Author(s)
-
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Magister Teknik Sipil Universitas Kristen Petra, 2017
Language
Indonesian
ISBN
-
Series
Tesis No. 01000236/MTS/2017
Subject(s)
CIVIL ENGINEERING-CONTRACT AND SPECIFICATIONS
CONSTRUCTION PROJECTS-MANAGEMENT
CONSTRUCTION INDUSTRY-MANAGEMENT
Notes
Appendix: p. 93-175
. Bibliography: p. 92.
Abstract
-
Physical Dimension
Number of Page(s)
xiv, 175 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
00595/17
(T2) MTS 0236
Library - 8th Floor
Available
Similar Collection
by author or subject
Seminar sehari recent development in construction management, 28 November 1996
Inspeksi pelaksanaan bekisting pada proyek konstruksi X
Identifikasi faktor-faktor yang mempengaruhi "time performance" dari kontraktor proyek ruko di Surabaya
Construction scheduling with primavera project planner
Analisa faktor kepuasan penghuni apartemen menengah bawah di Surabaya
Studi kasus harga satuan upah dan bahan beton bertulang untuk proyek bangunan satu lantai
Pembuatan dan aplikasi program simulasi kinerja backhoe-dump truck pada pemindahan tanah mekanis
Pengaruh penggunaan kombinasi viscosity modifying admixtures dan superplasticizer terhadap rheologi mortar dan beton self compacting concrete