Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Perhitungan percent plan completed dan identifikasi faktor tidak tercapainya rencana pekerjaan pada.
Author
Jonathan, Steven
Additional Author(s)
Jaya K., Robby Dwi
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Jurusan Teknik Sipil Universitas Kristen Petra, 2013
Language
Indonesian
ISBN
-
Series
Skripsi No. 21011903/SIP/2013
Subject(s)
CONSTRUCTION INDUSTRY-MANAGEMENT
Notes
. Bibliography: p. 121-122.
Abstract
-
Physical Dimension
Number of Page(s)
xxii, 122 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
02784/13
(T) 658.924 Jon P
-
Unavailable : Removed
Similar Collection
by author or subject
Analisis perencanaan dan pengendalian aliran kas untuk proyek konstruksi
Hubungan antara budaya organisasi dan tingkat kepercayaan pada perusahaan kontraktor di Surabaya
Program komputer untuk penyiapan kebutuhan tenaga kerja dalam proyek konstruksi
Studi tentang manajemen risiko dalam bidang manajemen konstruksi
Perancangan sistem informasi manajemen sumber daya manusia perusahaan kontraktor (studi kasus di P.T. "X")
Studi mengenai dampak lingkungan selama tahap pelaksanaan konstruksi gedung bertingkat
Analisis student center universitas Kristen Petra berdasarkan survai minat mahasiswa dan studi desain, dengan beberapa aspek pasar dan finansial
Analisis pemilihan kontaktor dalam mencapai kinerja proyek