Perhitungan percent plan completed dan identifikasi faktor tidak tercapainya rencana pekerjaan pada.
Author
Jonathan, Steven
Additional Author(s)
Jaya K., Robby Dwi
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Jurusan Teknik Sipil Universitas Kristen Petra, 2013
Language
Indonesian
ISBN
-
Series
Skripsi No. 21011903/SIP/2013
Subject(s)
CONSTRUCTION INDUSTRY-MANAGEMENT
Notes
. Bibliography: p. 121-122.
Abstract
-
Physical Dimension
Number of Page(s)
xxii, 122 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
02784/13
(T) 658.924 Jon P
-
Unavailable : Removed
Similar Collection
by author or subject
Pembuatan model assessment untuk identifikasi delapan pemborosan di bidang industri konstruksi
Faktor demotivasi staf profesional pada perusahaan kontraktor di Surabaya
Faktor-faktor kesuksesan proyek berdasarkan pendapat manajer proyek
Permasalahan yang terjadi pada gambar perencanaan dan spesifikasi teknis pada proses konstruksi
Pengukuran produktivitas pekerjaan dinding lite block dan hebel : studi kasus pada proyek x
Penanganan sisa material ready-mixed concrete pada proyek konstruksi
Pemakaian indeks dan kompensasi akibat inflasi pada perusahaan konstruksi
Analisis faktor-faktor yang dipertimbangkan konsumen dalam memilih lokasi perumahan menengah di Denpasar dan Kabupaten Badung, Bali