Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Perhitungan percent plan completed dan identifikasi faktor tidak tercapainya rencana pekerjaan pada.
Author
Jonathan, Steven
Additional Author(s)
Jaya K., Robby Dwi
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Jurusan Teknik Sipil Universitas Kristen Petra, 2013
Language
Indonesian
ISBN
-
Series
Skripsi No. 21011903/SIP/2013
Subject(s)
CONSTRUCTION INDUSTRY-MANAGEMENT
Notes
. Bibliography: p. 121-122.
Abstract
-
Physical Dimension
Number of Page(s)
xxii, 122 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
02784/13
(T) 658.924 Jon P
-
Unavailable : Removed
Similar Collection
by author or subject
Studi tentang produktivitas pekerjaan pasangan dinding setengah bata lantai dua pada proyek perumahan
Perbandingan aplikasi progam Microsoft Project dan Primavera dalam penjadwalan proyek konstruksi
Cara pendekatan perhitungan kuantitas pembesian pada balok struktur beton bertulang
Analisa pelaksanaan time management proyek konstruksi pada perusahaan kontraktor di Surabaya
Perbandingan komposisi pekerja pasangan dinding bata antara SNI 2008 dengan kenyataan di lapangan...
Hoist and elevators
Model simulasi um-cyclone pada operasional perusahaan beton siap pakai (studi kasus PT. Jatim Readymix)
Identifikasi dan alokasi risiko-risiko pada proyek superblok di Surabaya