Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Perhitungan percent plan completed dan identifikasi faktor tidak tercapainya rencana pekerjaan pada.
Author
Jonathan, Steven
Additional Author(s)
Jaya K., Robby Dwi
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Jurusan Teknik Sipil Universitas Kristen Petra, 2013
Language
Indonesian
ISBN
-
Series
Skripsi No. 21011903/SIP/2013
Subject(s)
CONSTRUCTION INDUSTRY-MANAGEMENT
Notes
. Bibliography: p. 121-122.
Abstract
-
Physical Dimension
Number of Page(s)
xxii, 122 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
02784/13
(T) 658.924 Jon P
-
Unavailable : Removed
Similar Collection
by author or subject
Analisis dampak negatif pelaksanaan pembangunan proyek terhadap lingkungan hidpu di sekitarnya
Faktor resiko yang kritis pada proyek water supply dan power plant dengan pola bot di Indonesia
Model pengaruh faktor laten terhadap perilaku pekerja pada cacat konstruksi
Mengenal klaim konstruksi dan penyelesaian sengketa konstruksi
Penyiapan bill of quantity untuk estimasi biaya pekerjaan konstruksi baja
Aplikasi program primavera project planner pada perencanaan dan penjadwalan proyek rusun
Studi faktor-faktor penyebab change order pada proyek konstruksi di Surabaya yang menggunakan kontrak traditional serta design-build
LKP : gedung Kampus ITATS