Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Perhitungan percent plan completed dan identifikasi faktor tidak tercapainya rencana pekerjaan pada.
Author
Jonathan, Steven
Additional Author(s)
Jaya K., Robby Dwi
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Jurusan Teknik Sipil Universitas Kristen Petra, 2013
Language
Indonesian
ISBN
-
Series
Skripsi No. 21011903/SIP/2013
Subject(s)
CONSTRUCTION INDUSTRY-MANAGEMENT
Notes
. Bibliography: p. 121-122.
Abstract
-
Physical Dimension
Number of Page(s)
xxii, 122 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
02784/13
(T) 658.924 Jon P
-
Unavailable : Removed
Similar Collection
by author or subject
Peranan konsultan manajemen konstruksi terhadap tingkat kemandirian masyarakat pada proyek P2MPD di Kabupaten Jember
Perbandingan kinerja bangunan yang didesain dengan force-based design dan direct displacement-based design menggunakan SNI gempa 2012
Studi tentang analisa pembengkakan biaya dan waktu pada proyek konstruksi real estate
Manajemen proyek konstruksi
Studi material Pacitan, Madura dan Pandaan sebagai lapisan permukaan jalan
Studi tentang manajemen pekerja bangunan untuk pemborong pemula di Surabaya
Studi kasus perbandingan berbagai bata ringan dari segi material, biaya, dan produktivitas
Produktifitas pekerjaan jacked pile driving dan faktor-faktor yang mempengaruhinya