Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Sistem penjadwalan LSM untuk proyek instalasi pipa bawah tanah (studi kasus: fuel supply system, proyek pengembangan Bandara Juanda Surabaya)
Author
Iswanto, Niko
Additional Author(s)
-
Publisher
Surabaya: Program Pascasarjana Teknik Sipil Magister Teknik UK Petra , 2006
Language
Indonesian
ISBN
-
Series
Tugas Akhir No.01000091/MTS/2006
Subject(s)
INDUSTRIAL PROJECT MANAGEMENT-COMPUTER PROGRAMS
CONSTRUCTION INDUSTRY-MANAGEMENT
Notes
Appendix
Bibliography
Abstract
-
Physical Dimension
Number of Page(s)
xv, 147 p.
Dimension
30 cm
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
04544/06
(T2) - 658.404 Isw S
-
Unavailable : Removed
Similar Collection
by author or subject
Perkembangan sustainable construction di Indonesia dan potensi penerapannya pada tahap pelaksanaan
Peranan konsultan manajemen konstruksi terhadap tingkat kemandirian masyarakat pada proyek P2MPD di Kabupaten Jember
Perbandingan penjadwalan proyek menggunakan kurva "S" dan CPM network pada proyek "X" di Surabaya
Faktor-faktor penghambat kontraktror untuk melaksanakan k3 pada proyek konstruksi
Model pengukuran tingkat motivasi dan demotivasi staf teknik perusahaan konsultan di Surabaya
Karier wanita dan faktor-faktor yang berpengaruh dalam proyek konstruksi
Case study of cost estimation procedure and development methods in RHDHV Indonesia
Studi tentang harga satuan upah pada proyek konstruksi