Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Case study of cost estimation procedure and development methods in RHDHV Indonesia
Author
Angkawijaya, Melissa
Additional Author(s)
-
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Jurusan Teknik Sipil Universitas Kristen Petra, 2013
Language
English
ISBN
-
Series
Skripsi No. 21011922/SIP/2013
Subject(s)
BUILDINGS-ESTIMATES
CONSTRUCTION INDUSTRY-MANAGEMENT
Notes
Appendix: p. 52 - 141
. Bibliography: p. 51.
Abstract
-
Physical Dimension
Number of Page(s)
xii, 141 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
02605/13
(T) SIP 1922
Library - 8th Floor
Unavailable : Removed
Similar Collection
by author or subject
Model pengaruh iklim keselamatan terhadap perilaku keselamatan dengan determinan pengetahuan dan motivasi pada proyek konstruksi
Studi mengenai dampak lingkungan selama tahap pelaksanaan konstruksi gedung bertingkat
Pembuatan model assessment untuk identifikasi delapan pemborosan di bidang industri konstruksi
Peranan broker properti dalam pemasaran produk real estate
Managing construction equipment
Pandangan konsultan perencana mengenai kualitas dokumen desain dan faktor-faktor yang mempengaruhinya
Keselamatan kerja pada pelaksanaan penggalian tanah berdasarkan standar osha
Analisis student center universitas Kristen Petra berdasarkan survai minat mahasiswa dan studi desain, dengan beberapa aspek pasar dan finansial