Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Case study of cost estimation procedure and development methods in RHDHV Indonesia
Author
Angkawijaya, Melissa
Additional Author(s)
-
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Jurusan Teknik Sipil Universitas Kristen Petra, 2013
Language
English
ISBN
-
Series
Skripsi No. 21011922/SIP/2013
Subject(s)
BUILDINGS-ESTIMATES
CONSTRUCTION INDUSTRY-MANAGEMENT
Notes
Appendix: p. 52 - 141
. Bibliography: p. 51.
Abstract
-
Physical Dimension
Number of Page(s)
xii, 141 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
02605/13
(T) SIP 1922
Library - 8th Floor
Unavailable : Removed
Similar Collection
by author or subject
CPM in construction management
Penentuan produktivitas pekerja sebagai dasar penentuan upah (studi kasus pada proyek perkantoran)
Faktor-faktor yang berperanan dalam penentuan kompensasi pekerja bangunan pada peusahaan kontraktor kelas A di Surabaya yang bergerak di bidang pembangunan gedung
Studi tentang komunikasi verbal dalam project launch meeting
Construction project management
Analisis pengaruh variabel lokasi, produk, harga, promosi, pelayanan dan desain terhadap minat konsumen factory outlet di Surabaya
Value engineering project report
Manajemen dalam pelaksanaan pembangunan