Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Case study of cost estimation procedure and development methods in RHDHV Indonesia
Author
Angkawijaya, Melissa
Additional Author(s)
-
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Jurusan Teknik Sipil Universitas Kristen Petra, 2013
Language
English
ISBN
-
Series
Skripsi No. 21011922/SIP/2013
Subject(s)
BUILDINGS-ESTIMATES
CONSTRUCTION INDUSTRY-MANAGEMENT
Notes
Appendix: p. 52 - 141
. Bibliography: p. 51.
Abstract
-
Physical Dimension
Number of Page(s)
xii, 141 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
02605/13
(T) SIP 1922
Library - 8th Floor
Unavailable : Removed
Similar Collection
by author or subject
Kecelakaan kerja pada pekerjaan beton bertulang akibat faktor manusia
Studi banding macam-macam denda keterlambatan penyelesaian proyek konstruksi
Pengukuran efektifitas dan frekuensi faktor yang mempengaruhi produktivitas pekerja pada pekerjaan finishing proyek rumah tinggal di Surabaya
Jenis pekerjaan yang mendominasi komposisi biaya pada proyek apartemen
Construction methods and management
Studi faktor-faktor penyebab change order pada proyek konstruksi di Surabaya yang menggunakan kontrak traditional serta design-build
Perbandingan sistem tunggal dan sistem ganda struktur baja rangka terbreis konsentris khusus berbentuk V terbalik dengan direct analysis method
Analisis pengaruh variabel lokasi, produk, harga, promosi, pelayanan dan desain terhadap minat konsumen factory outlet di Surabaya