Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Case study of cost estimation procedure and development methods in RHDHV Indonesia
Author
Angkawijaya, Melissa
Additional Author(s)
-
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Jurusan Teknik Sipil Universitas Kristen Petra, 2013
Language
English
ISBN
-
Series
Skripsi No. 21011922/SIP/2013
Subject(s)
BUILDINGS-ESTIMATES
CONSTRUCTION INDUSTRY-MANAGEMENT
Notes
Appendix: p. 52 - 141
. Bibliography: p. 51.
Abstract
-
Physical Dimension
Number of Page(s)
xii, 141 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
02605/13
(T) SIP 1922
Library - 8th Floor
Unavailable : Removed
Similar Collection
by author or subject
Sistem optimalisasi penjadwalan linear scheduling method pada proyek saluran irigasi
Analisa dampak kenaikan harga BBM terhadap biaya konstruksi
Construction planning, programming and control
Studi kasus harga satuan upah dan bahan beton bertulang untuk proyek bangunan satu lantai
Penelitian tentang pelaksanaan program K3, perkembangan dan hasilnya pada pekerjaan konstruksi beton di Surabaya
Studi perbandingan sistem dan prosedur di dalam manajemen material dengan manajemen bahan bangunan pada proyek konstruksi "X"
Studi litelatur tentang perkembangan critical chain method
Studi kasus perencanaan alokasi kebutuhan bahan pada proyek konstruksi gedung kuliah dan poliklinik Universitas Kristen Petra