Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Studi kasus perencanaan alokasi kebutuhan tenaga kerja pada proyek konstruksi gedung kuliah dan poliklinik Universitas Kristen Petra
Author
Palilingan, Aurum
Additional Author(s)
Herminto, Charles
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Jurusan Sipil UK Petra, 2007
Language
Indonesian
ISBN
-
Series
Tugas Akhir No.20401524/SIP/2007
Subject(s)
CONSTRUCTION INDUSTRY-MANAGEMENT
WORK MEASUREMENT
Notes
Appendix: p. 79
Bibliography: p. 78
Abstract
-
Physical Dimension
Number of Page(s)
xvi, 79 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
00985/07
(T) - 658.924 Pal S
Library - 8th Floor
Unavailable : Removed
Similar Collection
by author or subject
Analisa faktor-faktor yang mempengaruhi perencanaan durasi aktifitas dalam proyek koonstruksi
Studi literatur tentang penerapan metode T.R.I.Z. di bidang teknik sipil
Strategi peningkatan kinerja dengan metode balanced scorecard dan identifikasi workflow potential di PT X
Analisa keuntungan potensial penerapan partnering pada perusahaan kontraktor kelas A di Surabaya
Produktivitas pekerjaan beton bertulang untuk perhitungan harga satuan upah pekerjaan
Perancangan keseimbangan lintasan perakitan dengan algoritma genetika di PT Wijaya Indonesia Makmur Bicycle Industries Surabaya
Studi tentang faktor-faktor penetapan harga produk perumahan di surabaya
Pengaruh sistem manajemen k3 terhadap waktu dan biaya proyek