Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Perbandingan penjadwalan proyek menggunakan kurva "S" dan CPM network pada proyek "X" di Surabaya
Author
Sulistio, Wenly
Additional Author(s)
-
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Magister Teknik Sipil Universitas Kristen Petra, 2016
Language
Indonesian
ISBN
-
Series
Tesis No. 01000219/MTS/2016
Subject(s)
CONSTRUCTION INDUSTRY-MANAGEMENT
PROJECT MANAGEMENT
Notes
Appendix: p. 54-244
. Bibliography: p. 53.
Abstract
-
Physical Dimension
Number of Page(s)
xiii, 244 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
02620/16
(T2) MTS 0219
Library - 8th Floor
Unavailable : Removed
Similar Collection
by author or subject
Analisis faktor penyebab keterlambatan pada bangunan tinggi di Surabaya
Studi awal penerapan teory fuzzy set dalam memilih kontraktor pemenang tender
Studi kasus penerapan rekayasa nilai pada suatu proyek rumah tinggal
Model matematis hubungan kinerja konsultan dan komunikasi dalam proyek konstruksi
Identifikasi dan alokasi risiko-risiko pada proyek superblok di Surabaya
Prefabrication dan modular construction serta pengaruh precast terhadap scheduling proyek
Elemen segitiga berbasis kriging dengan tegangan kontinu pada titik nodal
Monitoring dan analisis jadwal proyek menggunakan metode performance intensity dan CPM pada proyek hotel