Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Perbandingan penjadwalan proyek menggunakan kurva "S" dan CPM network pada proyek "X" di Surabaya
Author
Sulistio, Wenly
Additional Author(s)
-
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Magister Teknik Sipil Universitas Kristen Petra, 2016
Language
Indonesian
ISBN
-
Series
Tesis No. 01000219/MTS/2016
Subject(s)
CONSTRUCTION INDUSTRY-MANAGEMENT
PROJECT MANAGEMENT
Notes
Appendix: p. 54-244
. Bibliography: p. 53.
Abstract
-
Physical Dimension
Number of Page(s)
xiii, 244 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
02620/16
(T2) MTS 0219
Library - 8th Floor
Unavailable : Removed
Similar Collection
by author or subject
Hoist and elevators
Prefabrication dan modular construction serta pengaruh precast terhadap scheduling proyek
Survei tingkat kepentingan dan penerapan sumber dan siklus material dari greenship rating tools pada proyek konstruksi
Manajemen risiko pada kecelakaan kerja di proyek konstruksi
Studi tentang upah dan upah lembur tenaga kerja pada proyek konstruksi bangunan bertingkat tinggi
Studi kasus pengukuran produktivitas pekerjaan pemancangan pada proyek x dan faktor-faktor yang mempengaruhinya
Perbandingan produktivitas tenaga kerja untuk beberapa jenis pekerjaan pada bangunan perumahan
Determining contractor selection criteria based in project types and project objectives