Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Penyiapan bar bending schedule untuk proyek konstruksi
Author
Mayasari S, Lenny
Additional Author(s)
Purwanti, Mita Dwi
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Jurusan Sipil UK Petra, 2006
Language
Indonesian
ISBN
-
Series
Tugas Akhir No.20211491/SIP/2006
Subject(s)
BAR BENDING SCHEDULE-COMPUTER PROGRAMS
CONSTRUCTION INDUSTRY-MANAGEMENT
Notes
Appendix:
Bibliography: p. 175
Abstract
-
Physical Dimension
Number of Page(s)
xxi, 175 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
05664/06
(T) - 658.924 May P
-
Unavailable : Removed
Similar Collection
by author or subject
Faktor demotivasi staf profesional pada perusahaan kontraktor di Surabaya
Analisis faktor-faktor yang dipertimbangkan konsumen dalam memilih lokasi perumahan menengah di Denpasar dan Kabupaten Badung, Bali
Studi penerapan keselamatan dan kesehatan kerja (K-3) dalam penggunaan tower crane pada proyek konstruksi
Analisa kesiapan penerapan concurrent engineering pada kontraktor di Surabaya
Studi optimasi perencanaan site layout pada proyek konstruksi dengan menggunakan program quantitative system verson 3.0
Aspek-aspek manajemen usaha
Pelaksanaan metode SPC dan penilaian tingkat risiko kecelakaan kerja pada pekerjaan struktur proyek X
Analisis faktor penyebab keterlambatan pada bangunan tinggi di Surabaya