Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Penyiapan bar bending schedule untuk proyek konstruksi
Author
Mayasari S, Lenny
Additional Author(s)
Purwanti, Mita Dwi
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Jurusan Sipil UK Petra, 2006
Language
Indonesian
ISBN
-
Series
Tugas Akhir No.20211491/SIP/2006
Subject(s)
BAR BENDING SCHEDULE-COMPUTER PROGRAMS
CONSTRUCTION INDUSTRY-MANAGEMENT
Notes
Appendix:
Bibliography: p. 175
Abstract
-
Physical Dimension
Number of Page(s)
xxi, 175 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
05664/06
(T) - 658.924 May P
-
Unavailable : Removed
Similar Collection
by author or subject
Survei tingkat kepuasan penyewa terhadap fasilitas yang disediakan pengelola di gedung perkantoran "X" Surabaya
Analisa faktor dan uji diskriminan terhadap kepuasan penghuni apartemen sekitar kampus di Surabaya
Analisa pelaksanaan time management proyek konstruksi pada perusahaan kontraktor di Surabaya
Analisis jadwal pelaksanaan pekerjaan struktur proyek 6 lantai dengan menggunakan program microsoft project 2003
Penentuan produktivitas tenaga kerja pada proyek gudang struktur baja berdasarkan durasi pert (project evaluation review technique)
Keselamatan kerja pada pelaksanaan penggalian tanah berdasarkan standar osha
Hubungan antara time overruns dan kepuasan konsumen menurut pendapat kontraktor dan pengembang pada proyek perumahan
Pengaruh budaya keselamatan kerja pada perilaku pekerja terhadap keselamatan kerja