Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Penyiapan bar bending schedule untuk proyek konstruksi
Author
Mayasari S, Lenny
Additional Author(s)
Purwanti, Mita Dwi
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Jurusan Sipil UK Petra, 2006
Language
Indonesian
ISBN
-
Series
Tugas Akhir No.20211491/SIP/2006
Subject(s)
BAR BENDING SCHEDULE-COMPUTER PROGRAMS
CONSTRUCTION INDUSTRY-MANAGEMENT
Notes
Appendix:
Bibliography: p. 175
Abstract
-
Physical Dimension
Number of Page(s)
xxi, 175 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
05664/06
(T) - 658.924 May P
-
Unavailable : Removed
Similar Collection
by author or subject
Construction planning for engineers
Construction project administration
Faktor-faktor penghambat value management process pada tahapan konstruksi
Penyiapan sarana untuk evaluasi kemajuan proyek konstruksi
Studi perbandingan analisa biaya konstruksi bangunan gedung berdasarkan SNI 2002 dan BOW
Fast build
Pandangan konsultan perencana mengenai kualitas dokumen desain dan faktor-faktor yang mempengaruhinya
Eliminasi shear locking pada elemen pelat reissner-mindlin berbasis kriging dengan metode discrete shear GAP (DSG)